Skip to main content

Norway: landslide closes bridge amid concerns for infrastructure

A bridge carrying one of Norway’s busiest motorways remains closed after a major earth slide severely damaged its supporting columns this week. The bridge closure comes as Norway’s Public Roads Administration said it is concerned about the condition of 104 bridges throughout the country, although they remain safe to use. Two of the foundation pillars of the bridge at Holmestrand, along the Highway E-18 through Vestfold County, were affected and dropped a span by up to 1.5m, creating a severe dip and crack
February 12, 2015 Read time: 2 mins

A bridge carrying one of Norway’s busiest motorways remains closed after a major earth slide severely damaged its supporting columns this week.

The bridge closure comes as Norway’s Public Roads Administration said it is concerned about the condition of 104 bridges throughout the country, although they remain safe to use.

Two of the foundation pillars of the bridge at Holmestrand, along the Highway E-18 through Vestfold County, were affected and dropped a span by up to 1.5m, creating a severe dip and cracks in the road surface.

No injuries were reported, but several trucks and cars remain on the bridge close to the breaking point because it is too risky to try to back them up, according to a report in the English-language Norway Post.

Geologists and bridge construction experts will examine the bridge and foundations this week, but the structure is expected to be closed for several months.

NPRA said in its report this month that inspections of the country’s bridges have noted rust, disintegrating central support systems and rotting pillars, according to media reports.

Morten Wright, senior engineer at the administration, said that the NPRA prioritises the most serious cases when it comes to maintenance and contractors perform daily inspections of bridges.

The government increased maintenance funding by around 40% between 2014-15, according to Ketil Solvik-Olsen, minister of transport and communications.

Related Content

  • Simple road safety measures save lives
    February 15, 2012
    Elementary road safety measures quickly pay back the costs of investment and, more importantly, help save lives as Patrick Smith reports. More than 300 people in the UK are alive today or have avoided the prospect of a lifetime of special care because just 15 roads have had simple improvements put in place.
  • UNCIEF promoting safer commutes for children to education
    June 4, 2015
    Children should have the right of a safe journey to and from school, as part of a wider strategy to build safe, healthy and liveable communities, recommends a new report from UNICEF and the FIA Foundation. The report, ‘Safe to Learn’, was published to mark the 3rd United Nations Global Road Safety Week, which has a theme of child safety. The report was launched at an event at the World Bank in Washington DC by Zoleka Mandela, a global road safety activist, bereaved mother of a road traffic victim, and gran
  • Damaged Norwegian bridge undergoes successful demolition
    February 23, 2015
    A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours