Skip to main content

Norway highway expansion programme planned

Norway’s Public Roads Administration is looking to boost highway construction in the country. Previously only routes carrying more than 12,000 vehicles/day would be considered for upgrade to highway status. However a new report from the Norwegian Public Roads Administration is looking to upgrade roads carrying traffic loads of 6,000-12,000 vehicles/day to highway status also. This could result in an additional 1,110km of roads being upgraded to highway status. These would feature two lanes in either directi
December 19, 2018 Read time: 1 min

Norway’s Public Roads Administration is looking to boost highway construction in the country. Previously only routes carrying more than 12,000 vehicles/day would be considered for upgrade to highway status. However a new report from the Norwegian Public Roads Administration is looking to upgrade roads carrying traffic loads of 6,000-12,000 vehicles/day to highway status also. This could result in an additional 1,110km of roads being upgraded to highway status. These would feature two lanes in either direction and speed limits of up to 110km/h.

Related Content

  • Norway’s Blakkesrud Bridge to remain closed
    November 24, 2022
    The wooden bridge, which has undergone inspection, is one of a dozen or so wooden bridges closed after the collapse of the Tretten Bridge in August.
  • Cost reductions on Russian highways
    July 12, 2012
    Major cost reductions are being seen on some key highway projects in Russia including the new ring road project in St Petersburg, where the reduction is US$192.31 million. The management of the ring road in St Petersburg has signed an agreement with the main contractors (Flora, the corporation Inzhtransstroy) to cut costs by 12-17.6% in 2009-2010. The 12% reduction is equivalent to US$32.05 million and will apply to contractors that are to complete facilities in 2009. Meanwhile the 17.6% cut is for work pla
  • Oslofjord Tunnel closed for repairs for up to three weeks
    May 12, 2017
    The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5. Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will
  • Foundations for Mexico highway with help from Liebherr
    November 9, 2017
    A Liebherr rotary drill rig and oscillator combination has been working in Mexico on a highway project for contractor Mota-Engil. A Liebherr piling rig is playing an important role on a major Mexican highway construction project being carried out by a division of the Portuguese firm Mota-Engil. The use of the rig by Mota-Engil Mexico’s newly formed geotechnical division is helping to set new quality standards for piling in the country. The contractor is leasing one of the latest Liebherr LB 24-270 rotary