Skip to main content

Norway drops tender plans for second Sotra fixed link

Statens Vegvesen, the Norwegian Road Administration, has cancelled tender plans for a new Sotra fixed link project that were scheduled for the spring. Jon Georg Dale, minister of transport, recently told the Norwegian Parliament that the geology near Lake Storavatnet along the route of the project, of which the second bridge would be a part, has caused concern among planners. Also, reconstruction of a high-voltage power cable has come under questions. Helge Eidsnes, a regional manager of Statens Vegve
February 18, 2019 Read time: 2 mins
Artist impression of a proposed four-lane Sotra Bridge, a suspension crossing beside the existing two-lane bridge that opened in 1971 (photo courtesy Statens Vegvesen)
1208 Statens Vegvesen, the Norwegian Road Administration, has cancelled tender plans for a new Sotra fixed link project that were scheduled for the spring.


Jon Georg Dale, minister of transport, recently told the Norwegian Parliament that the geology near Lake Storavatnet along the route of the project, of which the second bridge would be a part, has caused concern among planners. Also, reconstruction of a high-voltage power cable has come under questions.

Helge Eidsnes, a regional manager of Statens Vegvesen, said a new project plan will be presented in the summer. The project is intended to be a public-private partnership.

Last May, Parliament approved the €1.03 billion project - priority in the National Transport Plan for 2018–2023 - that included the nearly 1km Sotra Bridge. The signing of the contract was to have been in early 2020, according to the process laid out by Statens Vegvesen.

The proposed four-lane Sotra suspension bridge is 29.5m wide and has a 592m main span with the two towers rising 144m above sea level. A separate pedestrian path and separate cycle lane, both 5m wide, were part of the design.

The project overall has 19 other smaller bridges, 11 overpasses/underpasses and 21 tunnel portals. Around 11 tunnels through the mountains were envisaged, from 1-2km longs. Around 24km of access roads are scheduled with nearly 14km of bicycle and pedestrian paths, around 3m wide.

The new bridge is to be built parallel to the existing two-lane 1.2km concrete suspension Sotra Bridge that opened in 1971. It carries around 22,700 daily, estimated to rise to 26,000 by 2024. It crosses Knarreviksundet (Knarrevik Sound) that separates the island of Litlesotra, part of the Sotra archipelago, from the mainland and the city Bergen.

A new bridge is needed because, according to Statens Vegvesen, over the past 15 years there has been a strong increase in traffic between Sotra and Bergen. But old bridge is vulnerable to high winds and is closed when wind speed exceeds 30m/sec.

For more information on companies in this article

Related Content

  • Norway moves toward more E39 coastal road improvements
    April 4, 2019
    Norway is working on plans to make more of the major north-south E39 coastal route a ferry-free highway, coasting €35.3 billion, according to media. In Norway, the trans-European route 39 is part national road system and is developed and maintained by the public roads administration. It runs for 1,330km along the coast from Klett just south of Trondheim to Nørresundby. Norway’s E39 is mostly a two-lane undivided road with only relatively short sections near Stavanger, Trondheim and Bergen being motorw
  • Companies line up for Norway’s Rogfast project at Kvitsøy
    November 27, 2018
    Five companies have expressed an interest in the technically challenging €315 million Kvitsøy section of Norway’s major road and tunnel project Rogfast.
  • Norway’s E18 Lysaker-to-Ramstadsletta project faces funding issue
    December 20, 2018
    A lack of financing is jeopardising construction of the new E18 highway between Lysaker and Asker on the outskirts of Oslo. Media reports say that the Norwegian Road Administration (Statens Vegvesen) has received no funding for the project that is scheduled to start next year. The first phase of the project, between Lysaker and Ramstadsletta, has been scheduled for 2019-2024. Around 90,000 vehicles use the existing E18 road, a local thoroughfare. The new E18 will include cycle paths, pedestrian ways a
  • Norway considers wooden bridge across Lake Mjosa
    May 12, 2017
    Norway could be home to the world’s longest wooden bridge if the government gives the go-ahead for a span across Lake Mjosa. In a new report, researchers conclude that it is possible, both technically and economically, to build a 1.7km wooden bridge between the towns Biri and Moelv. Importantly, the report notes that construction cost differences between a wooden and concrete structure would be little. Estimates for a wooden bridge are around €420 million while for a concrete structure would come in about €