Skip to main content

Norway drops planned fixed link between Moss and Horten

Norway’s Road Administration has stopped investigations into a proposed bridge or tunnel spanning 10.5km of the Oslofjord between Moss and Horten, according to Norwegian media. The Ministry of Transport has ordered Veivesendet to cancel consultations amid the government’s growing concern over the cost of any fixed link across the narrows, around 65km south of the capital Oslo. The half-hour car-ferry crossing as part of National Highway 19 will continue as usual. Several thousand people and vehicles m
October 25, 2018 Read time: 2 mins
Detour: Norway cancels a crossing of the Oslofjord, the country’s busiest shipping route and most populated areas.
Norway’s Road Administration has stopped investigations into a proposed bridge or tunnel spanning 10.5km of the Oslofjord between Moss and Horten, according to Norwegian media.


The Ministry of Transport has ordered Veivesendet to cancel consultations amid the government’s growing concern over the cost of any fixed link across the narrows, around 65km south of the capital Oslo.

The half-hour car-ferry crossing as part of National Highway 19 will continue as usual. Several thousand people and vehicles make the journey daily, newspapers reported.

The tolled Moss-Horten Tunnel was to be 17km long and 325m below sea level. It was also to meet 1116 European Union requirements of a maximum 6% gradient.

There is already a road tunnel across the fjord, at Dobrak, a small town of around 14,000 and about 40km south of Oslo. The three-lane 7.3km Oslofjord Tunnel, part of National Highway 23, was opened in 2000. The third lane is used as a climbing lane – for traffic heading uphill and overcoming the 7% gradient. The 11.5m-wide tunnel can handle around 7,500 vehicles daily with a speed limit of 70kph, enforced by speed cameras.

The Oslofjord Tunnel was shut down for three weeks in May last year for major repairs after an extensive truck fire. There were no injuries but around 300m of the tunnel needed repairs.

For more information on companies in this article

Related Content

  • Faroes: NCC careful of Sandoy Tunnel work around St Magnus Cathedral
    March 17, 2020
    NCC is careful to not disturb the 800-year old St Magnus Cathedral on Sandoy Island.
  • Norway’s Blakkesrud Bridge to remain closed
    November 24, 2022
    The wooden bridge, which has undergone inspection, is one of a dozen or so wooden bridges closed after the collapse of the Tretten Bridge in August.
  • EU launches investigation into Fehmarn Belt financing model
    June 21, 2019
    The European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules. The announcement follows the European Union General Court's annulment of a previous Commission decision approving the support. "Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev