Skip to main content

Norway drops planned fixed link between Moss and Horten

Norway’s Road Administration has stopped investigations into a proposed bridge or tunnel spanning 10.5km of the Oslofjord between Moss and Horten, according to Norwegian media. The Ministry of Transport has ordered Veivesendet to cancel consultations amid the government’s growing concern over the cost of any fixed link across the narrows, around 65km south of the capital Oslo. The half-hour car-ferry crossing as part of National Highway 19 will continue as usual. Several thousand people and vehicles m
October 25, 2018 Read time: 2 mins
Detour: Norway cancels a crossing of the Oslofjord, the country’s busiest shipping route and most populated areas.
Norway’s Road Administration has stopped investigations into a proposed bridge or tunnel spanning 10.5km of the Oslofjord between Moss and Horten, according to Norwegian media.


The Ministry of Transport has ordered Veivesendet to cancel consultations amid the government’s growing concern over the cost of any fixed link across the narrows, around 65km south of the capital Oslo.

The half-hour car-ferry crossing as part of National Highway 19 will continue as usual. Several thousand people and vehicles make the journey daily, newspapers reported.

The tolled Moss-Horten Tunnel was to be 17km long and 325m below sea level. It was also to meet 1116 European Union requirements of a maximum 6% gradient.

There is already a road tunnel across the fjord, at Dobrak, a small town of around 14,000 and about 40km south of Oslo. The three-lane 7.3km Oslofjord Tunnel, part of National Highway 23, was opened in 2000. The third lane is used as a climbing lane – for traffic heading uphill and overcoming the 7% gradient. The 11.5m-wide tunnel can handle around 7,500 vehicles daily with a speed limit of 70kph, enforced by speed cameras.

The Oslofjord Tunnel was shut down for three weeks in May last year for major repairs after an extensive truck fire. There were no injuries but around 300m of the tunnel needed repairs.

For more information on companies in this article

Related Content

  • Norway’s long tunnel looks set to beat records
    September 19, 2016
    Norway looks set to retain its position as a leader in tunnelling with the project moving forward to build a new link connecting the city of Stavanger with Bokn. This 27km road tunnel is being designed to carry four lanes of traffic, which would make it the world’s longest underwater road tunnel. It will also be the world’s longest four lane tunnel as well as the world’s deepest road tunnel, dropping around 385-390m below sea level. The Rogaland Fixed Link will form part of the E39 route, connecting Kristia
  • Norway is reconsidering its key transport plan
    October 7, 2019
    Norway is reconsidering its key transport plan aimed at removing the need for ferries along its coast. The programme was intended to build bridges and tunnels along the E39 route connecting Trondheim and Kristiansand. The route runs from Kristiansand in the south of the country, along the coastline. Norway’s scenic coast features many fjords, with ferries currently crossing many of these. However the plan had been to build a series of bridges and tunnels to speed transport. Faced with spiralling cost
  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Shortlist set for Norway’s Sotra PPP project
    May 21, 2020
    Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.