Skip to main content

Norway drops planned fixed link between Moss and Horten

Norway’s Road Administration has stopped investigations into a proposed bridge or tunnel spanning 10.5km of the Oslofjord between Moss and Horten, according to Norwegian media. The Ministry of Transport has ordered Veivesendet to cancel consultations amid the government’s growing concern over the cost of any fixed link across the narrows, around 65km south of the capital Oslo. The half-hour car-ferry crossing as part of National Highway 19 will continue as usual. Several thousand people and vehicles m
October 25, 2018 Read time: 2 mins
Detour: Norway cancels a crossing of the Oslofjord, the country’s busiest shipping route and most populated areas.
Norway’s Road Administration has stopped investigations into a proposed bridge or tunnel spanning 10.5km of the Oslofjord between Moss and Horten, according to Norwegian media.


The Ministry of Transport has ordered Veivesendet to cancel consultations amid the government’s growing concern over the cost of any fixed link across the narrows, around 65km south of the capital Oslo.

The half-hour car-ferry crossing as part of National Highway 19 will continue as usual. Several thousand people and vehicles make the journey daily, newspapers reported.

The tolled Moss-Horten Tunnel was to be 17km long and 325m below sea level. It was also to meet 1116 European Union requirements of a maximum 6% gradient.

There is already a road tunnel across the fjord, at Dobrak, a small town of around 14,000 and about 40km south of Oslo. The three-lane 7.3km Oslofjord Tunnel, part of National Highway 23, was opened in 2000. The third lane is used as a climbing lane – for traffic heading uphill and overcoming the 7% gradient. The 11.5m-wide tunnel can handle around 7,500 vehicles daily with a speed limit of 70kph, enforced by speed cameras.

The Oslofjord Tunnel was shut down for three weeks in May last year for major repairs after an extensive truck fire. There were no injuries but around 300m of the tunnel needed repairs.

For more information on companies in this article

Related Content

  • Work starting on Norway’s mega-tunnel project
    January 5, 2018
    Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the
  • Finland ploughs ahead with a planned Hailuoto causeway
    May 8, 2018
    Finland’s planned 8km Hailuoto Causeway is likely to cost around €74 million, according to the North Ostrobothnia Centre for Economic Development, Transport and the Environment.
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Acciona, Leonhard Nilsen & Sonner and Multiconsult win Norway E6
    July 23, 2018
    Spain’s Acciona, working with Leonhard Nilsen & Sonner and Multiconsult, has picked up a €420 million contract for construction of 23km of Norway’s E6 motorway. The work, between the towns of Ranheim and Vaernes, was awarded by state-owned motorway operator Nye Veier. It involves construction of a four-lane motorway section for vehicles travelling at a maximum speed of 110kph.