Skip to main content

Norway considers wooden bridge across Lake Mjosa

Norway could be home to the world’s longest wooden bridge if the government gives the go-ahead for a span across Lake Mjosa. In a new report, researchers conclude that it is possible, both technically and economically, to build a 1.7km wooden bridge between the towns Biri and Moelv. Importantly, the report notes that construction cost differences between a wooden and concrete structure would be little. Estimates for a wooden bridge are around €420 million while for a concrete structure would come in about €
May 12, 2017 Read time: 2 mins
Norway could be home to the world’s longest wooden bridge if the government gives the go-ahead for a span across Lake Mjosa.


In a new report, researchers conclude that it is possible, both technically and economically, to build a 1.7km wooden bridge between the towns Biri and Moelv. Importantly, the report notes that construction cost differences between a wooden and concrete structure would be little.

Estimates for a wooden bridge are around €420 million while for a concrete structure would come in about €410 million, according to Trond Arne Stensby, project manager at the Norwegian Public Roads Administration - 1208 Statens vegvesen.

The 468m-deep Lake Mjøsa is one of the deepest in Europe and the fourth-deepest lake in Norway. It stretches for 117km and is about 15km at its widest. The lake is 123m above sea level and lies about 100km north of the capital Oslo.

One bridge already crosses the lake, the Mjøsa Bridge that was opened 1985 and is part of the main north-south highway in Norway, the E6. The concrete box girder bridge has spans of around 69m and rests on piles in water up to 40m deep. The bridge has two lanes of traffic and separate pedestrian and cycling lane.

Previous studies have considered a four-lane link on Highway E6 between the cities of Hamar and Lillehammer – site of the 1994 Winter Olympics. Timber construction alternatives include a truss structure with two underlying trusses composite with a concrete bridge deck. Typical span width is 69m and be cable stay supported.

For more information on companies in this article

Related Content

  • Norwegian Public Roads Administration’s €10bn for roads and tunnels
    September 24, 2013
    The Norwegian Public Roads Administration (Statens vegvesen) plans to invest €10 billion (NOK 80 billion) in road building and tunnel upgrades from 2014-17, according to its new investment plan for the period. A further another €2.87 billion (NOK 23 billion) will be spent on pedestrian and cyclist safety measures. Veidekke, a Norwegian construction company, forecasts 2-3% annual growth in the Norwegian construction market in 2014, but with a flattening out of housing construction. It forecasts Sweden
  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow
  • South Africa bridge deals for Msikaba and Mtentu rivers by end 2016
    August 1, 2016
    The South African National Roads Agency (SANRAL) said it is on track to announce tender winners for two bridges, across the Msikaba River and Mtentu River, by the end of the year. The Msikaba River Bridge will be constructed on the N2 Wild Coast Toll Road and will consist of a cable-stayed 580m-long structure spanning a deep gorge. The Mtentu River Bridge, also on the N2 Wild Coast Toll Road and around 12km to the north of Msikaba River, is expected to be a concrete structure and nearl.y 1.2kkm long.