Skip to main content

Nigeria’s new Niger River crossing construction underway

Preparation work for the access roads to Nigeria’s new Niger River crossing has now commenced. Construction of the bridge itself looks likely to commence in 2015 and this long delayed project has been the subject of much scrutiny and comment within Nigeria. Contractor Julius Berger has the concession for the US$700 million bridge, which will carry both road and rail links. The site of the new bridge is close to the commercial city of Onitsha, which is a major transport hub for Nigeria. High volumes of throu
August 14, 2014 Read time: 2 mins
Preparation work for the access roads to Nigeria’s new Niger River crossing has now commenced. Construction of the bridge itself looks likely to commence in 2015 and this long delayed project has been the subject of much scrutiny and comment within Nigeria. Contractor 7740 Julius Berger has the concession for the US$700 million bridge, which will carry both road and rail links. The site of the new bridge is close to the commercial city of Onitsha, which is a major transport hub for Nigeria. High volumes of through traffic pass through the area between east and west and also from the north to the south of the country. The new bridge is needed as the existing structure is ageing and there are questions over its long term structural integrity, while it will be unable to cope with anticipated traffic volumes. The old bridge has a somewhat chequered history, having been opened in the mid-1960s, blown up shortly after during the Nigerian/Biafran civil War and then repaired after the cease of hostilities.

For more information on companies in this article

Related Content

  • Questions and delays afflict some key Indonesian transport project
    March 28, 2014
    Indonesia’s transport expansion programme is seeing new projects commence, but others afflicted by questions over feasibility and delays. Questions over the economic feasibility of the proposed Sunda Strait Bridge project have been raised by the Public Works Ministry. This mega-project is intended to provide a road link between Sumatra and Java. But construction of the 30km structure could cost up to US$23 billion and might not be fully recovered, even if the investor collects toll fees under a 100-year con
  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c
  • Shortlist set for Norway’s Sotra PPP project
    May 21, 2020
    Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.