Skip to main content

Nigeria’s new Niger River crossing construction underway

Preparation work for the access roads to Nigeria’s new Niger River crossing has now commenced. Construction of the bridge itself looks likely to commence in 2015 and this long delayed project has been the subject of much scrutiny and comment within Nigeria. Contractor Julius Berger has the concession for the US$700 million bridge, which will carry both road and rail links. The site of the new bridge is close to the commercial city of Onitsha, which is a major transport hub for Nigeria. High volumes of throu
August 14, 2014 Read time: 2 mins
Preparation work for the access roads to Nigeria’s new Niger River crossing has now commenced. Construction of the bridge itself looks likely to commence in 2015 and this long delayed project has been the subject of much scrutiny and comment within Nigeria. Contractor 7740 Julius Berger has the concession for the US$700 million bridge, which will carry both road and rail links. The site of the new bridge is close to the commercial city of Onitsha, which is a major transport hub for Nigeria. High volumes of through traffic pass through the area between east and west and also from the north to the south of the country. The new bridge is needed as the existing structure is ageing and there are questions over its long term structural integrity, while it will be unable to cope with anticipated traffic volumes. The old bridge has a somewhat chequered history, having been opened in the mid-1960s, blown up shortly after during the Nigerian/Biafran civil War and then repaired after the cease of hostilities.

For more information on companies in this article

Related Content

  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well
  • The father of asset management speaks on the development of the concept
    May 24, 2016
    World Highways caught up with man who developed the concept of asset management for roads in the 1960s. Dr Ralph Haas is still researching in his native Canada, and commenting on potholes. The e-mail was brief. “You won't believe this, but I think I'm the last person on the planet without a cell phone.” That was quite an admission from Ralph Haas, distinguished Canadian professor emeritus. He was one of several civil engineers in the 1960s who developed the concept of managing roads as an integrated
  • Launch soon for the Sunderland Bridge’s deck across the Wear
    March 24, 2017
    The team constructing the New Wear Crossing near the English city of Sunderland is preparing for the final launch of the 300m bridge deck. In recent weeks, the legs of the 100m-tall centrepiece have been secured to the foundations within the riverbed and most of the rigging used to raise it into place has been removed. While the bridge deck was being painted, the bottoms of both pylon legs were filled with 175tonnes of concrete, The next major process will be to slowly pull the bridge deck out acr
  • Stonehenge tunnel going ahead?
    September 12, 2017
    The preferred route has been announced for a new road and tunnel link on the A303 route in the UK that will bypass the famous Stonehenge stone circle. The project now finally looks as if it might go ahead after years of debate, although several hurdles have yet to be passed. The work calls for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel. The new route will be located further away from Stonehenge and the tunnel is being built