Skip to main content

Nigeria’s new Niger River crossing construction underway

Preparation work for the access roads to Nigeria’s new Niger River crossing has now commenced. Construction of the bridge itself looks likely to commence in 2015 and this long delayed project has been the subject of much scrutiny and comment within Nigeria. Contractor Julius Berger has the concession for the US$700 million bridge, which will carry both road and rail links. The site of the new bridge is close to the commercial city of Onitsha, which is a major transport hub for Nigeria. High volumes of throu
August 14, 2014 Read time: 2 mins
Preparation work for the access roads to Nigeria’s new Niger River crossing has now commenced. Construction of the bridge itself looks likely to commence in 2015 and this long delayed project has been the subject of much scrutiny and comment within Nigeria. Contractor 7740 Julius Berger has the concession for the US$700 million bridge, which will carry both road and rail links. The site of the new bridge is close to the commercial city of Onitsha, which is a major transport hub for Nigeria. High volumes of through traffic pass through the area between east and west and also from the north to the south of the country. The new bridge is needed as the existing structure is ageing and there are questions over its long term structural integrity, while it will be unable to cope with anticipated traffic volumes. The old bridge has a somewhat chequered history, having been opened in the mid-1960s, blown up shortly after during the Nigerian/Biafran civil War and then repaired after the cease of hostilities.

For more information on companies in this article

Related Content

  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi
  • Finnish Motorway Finally finished: Finland's M1
    July 23, 2012
    It has taken a long time to complete, but a vital motorway link is open to traffic as Heikki Harri reports After almost 50 years of construction, the M1 motorway linking Helsinki, the Finnish capital city and Turku, the country's old capital in the southwest, is finally completed. It did not take all 50 years of construction but the first section from Helsinki towards the west was constructed in the mid -1960s. Then there was a pause until mid-1990s when the works resumed section by section. The final sect
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • New bridge link for Nigeria
    February 18, 2019
    Construction work on the important Loko-Oweto Bridge project in Nigeria should be complete in May 2019. The project has cost around US$141 million, with contractor Reynolds Construction Company having started work on the 1.8km structure in 2011. Spanning the River Benue, the bridge forms part of the 108km road link connecting Otukpo with Oweto and improves transport connections between Benue State and Nasarawa State. Work on a stretch of the road has been carried CGC Nigeria Limited. Upgrade work is also