Skip to main content

Nigeria’s FEC approve road works valued at US$768.43 million

Nigeria’s Federal Executive Council (FEC) has approved reconstruction deals for the five main economic arterial roads worth US$768.43 million (NGN 123.8 billion). A $92.1 million (NGN 14.99 billion) deal will see Julius Berger carry out the Apapa-Oshodi expressway section 2, phase II reconstruction has also been approved. The project is targeted for completion in 15 months. Kopek Construction has secured a $45.1 million (NGN 7.34 billion) deal to complete the Akure to Ilesha road in 21. Triacta Nigeria
August 22, 2013 Read time: 1 min
RSSNigeria’s Federal Executive Council (FEC) has approved reconstruction deals for the five main economic arterial roads worth US$768.43 million (NGN 123.8 billion).

A $92.1 million (NGN 14.99 billion) deal will see Julius Berger carry out the Apapa-Oshodi expressway section 2, phase II reconstruction has also been approved. The project is targeted for completion in 15 months.  Kopek Construction has secured a $45.1 million (NGN 7.34 billion) deal to complete the Akure to Ilesha road in 21. Triacta Nigeria has won a 67.03 million (NGN 10.91 billion) contract for the rehabilitation of Mokwa to Bida road over the next two years. The second section of the Enugu-Port Harcourt dual carriageway will be built within 40 months by Arab Contractors Nigeria who secured a construction deal worth $312.69 million (NGN 50.89 billion). Finally, Setraco Nigeria has won a $243.01 million contract to build first section of the Enugu-Port Harcourt dual carriage way over the next 40 months.

Related Content

  • UK: Kier Group completes purchase of Mouchel
    June 11, 2015
    In the UK, Kier Group has completed its purchase of Mouchel, the infrastructure repair and maintenance provider. The deal worth just more than €364 million (US$405 million) strengthens Kier's position in the British highways maintenance and management sector. A €467 million rights issue was used to finance the deal.
  • A key expressway project is due in Nepal
    July 26, 2012
    The Nepalese Government plans to open a key expressway project to tender. The Ministry of Physical Planning works and Transport Management is inviting bidders to show their interest in the construction of the Kathmandu-Nijgadh-Pathlaiya Terai/Madesh Expressway project. This new road link is intended to be offered under a PPP/BOT model. The 76km expressway is expected to cost US$853 million to construct. A feasibility study has been carried out and the expressway will be designed to meet the Class – A Catego
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Bosnia: more funds for Corridor C5 work
    June 25, 2021
    Bosnia’s national road agency Autoceste FBiHreports reports that 92km of Corridor 5C have been completed.