Skip to main content

Nigeria’s FEC approve road works valued at US$768.43 million

Nigeria’s Federal Executive Council (FEC) has approved reconstruction deals for the five main economic arterial roads worth US$768.43 million (NGN 123.8 billion). A $92.1 million (NGN 14.99 billion) deal will see Julius Berger carry out the Apapa-Oshodi expressway section 2, phase II reconstruction has also been approved. The project is targeted for completion in 15 months. Kopek Construction has secured a $45.1 million (NGN 7.34 billion) deal to complete the Akure to Ilesha road in 21. Triacta Nigeria
August 22, 2013 Read time: 1 min
RSSNigeria’s Federal Executive Council (FEC) has approved reconstruction deals for the five main economic arterial roads worth US$768.43 million (NGN 123.8 billion).

A $92.1 million (NGN 14.99 billion) deal will see Julius Berger carry out the Apapa-Oshodi expressway section 2, phase II reconstruction has also been approved. The project is targeted for completion in 15 months.  Kopek Construction has secured a $45.1 million (NGN 7.34 billion) deal to complete the Akure to Ilesha road in 21. Triacta Nigeria has won a 67.03 million (NGN 10.91 billion) contract for the rehabilitation of Mokwa to Bida road over the next two years. The second section of the Enugu-Port Harcourt dual carriageway will be built within 40 months by Arab Contractors Nigeria who secured a construction deal worth $312.69 million (NGN 50.89 billion). Finally, Setraco Nigeria has won a $243.01 million contract to build first section of the Enugu-Port Harcourt dual carriage way over the next 40 months.

Related Content

  • New road and tunnel project planned for Sweden
    August 21, 2015
    Swiss firm Implenia has won the contract to construct the first section of Stockholm’s new bypass in a deal worth €216.7 million. The Förbifart Stockholm road project was awarded by the Swedish Transport Administration, Trafikverket. Implenia won the package of works following its acquisition of Bilfinger Construction and will commence work during October 2015. The section Implenia will work on is called the FSE 403 stretch and the work includes building a 7.2km long, twin tube tunnel as well as slip roads.
  • Planning works start for a second Niger Bridge
    August 17, 2012
    The Federal Government of Nigeria gave the go-ahead for work to start on the planning and design of a new Niger bridge. The country’s leaders have approved a US$2 million (Nigerian Naira N325 million) “transactional advisory services” contract to assess how to design and build, finance and operate a “Second Niger Bridge.” Contractor Roughton International Limited has been given 16 months to come back with a detailed schedule of how to progress.
  • Hinergia bridge project finds federal funding
    March 27, 2017
    A budget worth nearly US$252 million will help pay for bridge design and construction work as well as bridge repair activities in 12 states across Nigeria. The budget has been approved by Nigeria’s Federal Executive Council (FEC). Meanwhile $475 million is being budgeted for the engineering and consultancy work required for the Second Niger Bridge that will connect the city of Asaba in Delta State with Onitsha in Anambra State. The new bridge is desperately required as the existing structure is in poor cond
  • South East Nigeria’s new dual carriageway planned
    September 21, 2015
    A new dual carriageway is planned for Nigeria’s Cross River State, in the South East of the country. The dual carriageway will connect the city of Calabar in the south of the state with Obudu in the north of the state. The project has had its official ground breaking ceremony carried out by the country’s president, Muhammadu Buhari. The dual carriageway will stretch around 260km in all according to reports in the Nigerian press. This new dual carriageway will help cut journey times as the condition of the e