Skip to main content

Nicaragua contract for FCC

Spanish contractor FCC has been awarded a contract to carry out key road upgrade works in Nicaragua. The €32 million project will see improvements being carried out on the 39km route connecting Los Chinamos with El Ayote.
December 14, 2017 Read time: 1 min
FCC will carry out road upgrades in Nicaragua

Spanish contractor 4914 FCC has been awarded a contract to carry out key road upgrade works in Nicaragua. The €32 million project will see improvements being carried out on the 39km route connecting Los Chinamos with El Ayote. The project will be carried out in two separate stages and will take 23 months to complete. The first section measures 19.6km long and runs from El Camastro to Los Chinamos. The second stretch is of a similar length and is from Los Chinamos to El Ayote. The client for the project is the Nicaraguan Ministry of Transport and Infrastructure (MTI). Work being carried out includes improvements to the alignment and drainage, as well as upgrades to bridges. The work is expected to improve transport in the area, improving safety for drivers while also reducing journey times.

For more information on companies in this article

Related Content

  • Costa Rica construction contracts
    May 22, 2020
    Costa Rica construction contracts are facing challenges.
  • Vietnam tunnel construction project
    November 21, 2016
    A new tunnel link in Vietnam will help boost road safety for drivers. This new twin tube tunnel connection will replace, the Ca Mountain Pass, a steep and dangerous mountain route in Vietnam
  • New plans for Russian roads being built
    March 12, 2019
    Major new highway projects are now progressing in Russia, with more detailed plans being drawn up. Two key projects are for the new Black Sea Coast Highway and the M-4 Don Transport Corridor. The Black Sea Coast Highway has seen some changes to the original proposals, with the high cost of the initial design having been a major factor in the revisions to the plans. The length of the new route will be 80.5km under the new proposals, with the work now costing around US$15 billion, some 2/3rds of the original
  • Mostostal Warszawa picked for S19 segment
    August 11, 2022
    The contract in northern Poland is worth around €211 million.