Skip to main content

New Zezelj’s Bridge in Novi Sad symbolises brotherhood and unity

The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open. The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj. The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high.
September 7, 2018 Read time: 2 mins
© Ivan Ramovic – dreamstime: Brotherhood and Unity Bridge - also known as Zezelj’s Bridge - straddles the Danube River in Novi Sad, Serbia

The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open.

The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj.

The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei  and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high. It has two rail tracks and two vehicle lanes.

It was destroyed during the 1999  bombing of Yugoslavia, of which Serbia was a part, by NATO – North Atlantic Treaty Organisation – forces.

NATO bombing also destroyed the Varadin Bridge and Liberty Bridge.
Serbian president Aleksandar Vucic and European Union commissioner for enlargement negotiations Johannes Hahn attended the opening ceremony for the new bridge. Serbia is a candidate for membership of the EU.

Hahn said the €54 million new bridge - 474m long and 31.45m wide - is a symbol of Serbia’s European integration and the country’s efforts to build bridges “between citizens, people, the past and the future.” One of the pillars from the old bridge, that was 377m long, is supporting part of the new structure was reused to support the new steel structure.

The EU allocated €25 million, Serbia’s province of Vojvodina and the city of Novi Sad allocated €25 million, while the state allocated the remaining €4 million.

The new bridge is part of the European railway Corridor 10 and will carry the future Belgrade-Budapest high-speed railway.

Related Content

  • Serbia invests in roads and bridges
    May 14, 2012
    Serbia should invest €1.5 billion a year over the next 20 years in order to finish all capital projects, which include road and railway Corridor 10, Corridor 11, the Danube (water) Corridor 7 and bridges in Novi Sad and Belgrade. Investments of €22 billion in infrastructure are planned in the next 17 years.
  • New Tisza River bypass bridge to be built at Szolnok, Hungary
    June 28, 2019
    Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million. Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years. Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Brid
  • EU construction machinery sector needs resolve as Brexit looms
    February 14, 2019
    German construction machinery manufacturers are concerned about a no-deal Brexit – UK exiting the European Union - and the possible disintegration of the EU. Rising global economic challenges can be mastered only with a strong, united Europe, according to the VDMA - Construction Equipment and Building Material Machinery Association. VDMA represents more than 3,200 mostly medium-sized companies in Germany’s mechanical and plant engineering sector. This was the view by attendees at the VDMA’s constructi
  • England’s A14 project River Great Ouse Viaduct completed
    February 28, 2019
    Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both