Skip to main content

New Zezelj’s Bridge in Novi Sad symbolises brotherhood and unity

The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open. The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj. The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high.
September 7, 2018 Read time: 2 mins
© Ivan Ramovic – dreamstime: Brotherhood and Unity Bridge - also known as Zezelj’s Bridge - straddles the Danube River in Novi Sad, Serbia

The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open.

The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj.

The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei  and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high. It has two rail tracks and two vehicle lanes.

It was destroyed during the 1999  bombing of Yugoslavia, of which Serbia was a part, by NATO – North Atlantic Treaty Organisation – forces.

NATO bombing also destroyed the Varadin Bridge and Liberty Bridge.
Serbian president Aleksandar Vucic and European Union commissioner for enlargement negotiations Johannes Hahn attended the opening ceremony for the new bridge. Serbia is a candidate for membership of the EU.

Hahn said the €54 million new bridge - 474m long and 31.45m wide - is a symbol of Serbia’s European integration and the country’s efforts to build bridges “between citizens, people, the past and the future.” One of the pillars from the old bridge, that was 377m long, is supporting part of the new structure was reused to support the new steel structure.

The EU allocated €25 million, Serbia’s province of Vojvodina and the city of Novi Sad allocated €25 million, while the state allocated the remaining €4 million.

The new bridge is part of the European railway Corridor 10 and will carry the future Belgrade-Budapest high-speed railway.

Related Content

  • Work to start on Fehmarn Belt link to start in autumn
    April 4, 2019
    Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou
  • Money lacking for Széchenyi Bridge renovation
    February 10, 2020
    Money problems for renovation of Budapest's Chain Bridge
  • Steinexpo2017: German earthmoving equipment sales on firm ground
    September 1, 2017
    Earthmoving sales in Germany this year could top 30,000, according to Joachim Schmid, managing director of VDMA - Construction Equipment and Building Materials Machinery Association. Orders are also up 14% on that of 2016, said Schmid who was speaking during this week’s Steinexpo2017 demonstration trade fair near the central German city of Homberg. The event is held in the Nieder-Ofleiden basalt quarry – the largest such quarry in Europe.
  • Slovakia plans €3.5bn plus spend on new roads and other infrastructure
    February 11, 2014
    Slovakia plans to invest more than €3.5 billion (US$ 4.76 billion) on new roads, motorways and other transport infrastructure, according to the draft partnership agreement between the European Union and Slovakia for the 2014-2020 budgetary period. The proposal claims that the current state of infrastructure in Slovakia is poor, technically obsolete and incomplete, which not only creates obstacles in the mobility of citizens but also reduces the attractiveness of the country for foreign investors. The coun