Skip to main content

New Zezelj’s Bridge in Novi Sad symbolises brotherhood and unity

The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open. The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj. The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high.
September 7, 2018 Read time: 2 mins
© Ivan Ramovic – dreamstime: Brotherhood and Unity Bridge - also known as Zezelj’s Bridge - straddles the Danube River in Novi Sad, Serbia

The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open.

The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj.

The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei  and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high. It has two rail tracks and two vehicle lanes.

It was destroyed during the 1999  bombing of Yugoslavia, of which Serbia was a part, by NATO – North Atlantic Treaty Organisation – forces.

NATO bombing also destroyed the Varadin Bridge and Liberty Bridge.
Serbian president Aleksandar Vucic and European Union commissioner for enlargement negotiations Johannes Hahn attended the opening ceremony for the new bridge. Serbia is a candidate for membership of the EU.

Hahn said the €54 million new bridge - 474m long and 31.45m wide - is a symbol of Serbia’s European integration and the country’s efforts to build bridges “between citizens, people, the past and the future.” One of the pillars from the old bridge, that was 377m long, is supporting part of the new structure was reused to support the new steel structure.

The EU allocated €25 million, Serbia’s province of Vojvodina and the city of Novi Sad allocated €25 million, while the state allocated the remaining €4 million.

The new bridge is part of the European railway Corridor 10 and will carry the future Belgrade-Budapest high-speed railway.

Related Content

  • Electro-fragmentation offers new recycling solution for fibre-reinforced concrete
    April 24, 2018
    A pan-European research project is investigating the use of electro-fragmentation to help recycle fibre-reinforced concrete (FRC). Increasingly used in civil applications such as tunnels and bridge decks, FRC can be challenging to recycle because of the difficulty in separating the tiny fibres from the concrete material. “Most of the research into FRC is about the formulation or the application of the material,” Kathy Bru, a process engineer at research organisation BRGM told a forum at the World of Concre
  • Cummins completes China collection
    November 21, 2018
    Cummins has showcased a full line of China Nonroad Stage IV emissions engines with the unveiling of the upgraded high performance 8.9-litre L series engine. The unit moves up to 298kW with a peak torque of 1800Nm – an 11% increase on its predecessor – and offers class-leading fuel economy and the ability to run at high altitudes while maintaining power capability. Cummins full line-up of engines for the new China Nonroad Stage IV emissions standard spans 2.8 to 15 litres displacement with a power capabili
  • Super job for a Demag CC 3800-1 without a Superlift counterweight
    July 4, 2019
    A Demag CC 3800-1 crane with an 84m-long main boom was recently set up in Germany without a Superlift counterweight to save space. The jobsite was the replacement of the old viaduct on the A45 Freeway that spans the Lahn River near Dorlar in Germany. Bietigheim-Bissingen-based crane service provider Wiesbauer solved the site’s space issues by using a Demag CC 3800-1. “This site required us to lift loads of 96-148tonnes at radii of 40-64m, so there was no option but to use a crawler crane in the 650tonne c
  • New Dubai bridge complete
    January 19, 2022
    A new landmark Dubai bridge link is now complete.