Skip to main content

New Zezelj’s Bridge in Novi Sad symbolises brotherhood and unity

The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open. The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj. The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high.
September 7, 2018 Read time: 2 mins
© Ivan Ramovic – dreamstime: Brotherhood and Unity Bridge - also known as Zezelj’s Bridge - straddles the Danube River in Novi Sad, Serbia

The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open.

The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj.

The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei  and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high. It has two rail tracks and two vehicle lanes.

It was destroyed during the 1999  bombing of Yugoslavia, of which Serbia was a part, by NATO – North Atlantic Treaty Organisation – forces.

NATO bombing also destroyed the Varadin Bridge and Liberty Bridge.
Serbian president Aleksandar Vucic and European Union commissioner for enlargement negotiations Johannes Hahn attended the opening ceremony for the new bridge. Serbia is a candidate for membership of the EU.

Hahn said the €54 million new bridge - 474m long and 31.45m wide - is a symbol of Serbia’s European integration and the country’s efforts to build bridges “between citizens, people, the past and the future.” One of the pillars from the old bridge, that was 377m long, is supporting part of the new structure was reused to support the new steel structure.

The EU allocated €25 million, Serbia’s province of Vojvodina and the city of Novi Sad allocated €25 million, while the state allocated the remaining €4 million.

The new bridge is part of the European railway Corridor 10 and will carry the future Belgrade-Budapest high-speed railway.

Related Content

  • Serbia ponders Chinese firm for Pozega-Boljare concession
    March 17, 2017
    Serbian prime minister Aleksandar Vucic said that part of the future Pozega-Boljare motorway towards Montenegro could be let under a concession to China. Meanwhile, Serbian minister of construction and infrastructure Zorana Mihajlovic, has said that around €9 billion of all types of infrastructure projects are underway. Included is the Corridor 10 motorway, due for completion by the beginning of 2018 and the 103km Obrenovac-Preljina motorway set for completion by the end of this year, as well as project
  • Driver distraction is a road safety risk
    September 12, 2019
    Driver distraction is an increasing concern for the road safety sector. According to the FIA Region 2 (Federation Internationale de l’Automobile), a distraction time of just two seconds is sufficient to cause a crash. The FIA’s data suggests that to 25% of road crashes are due to distraction, with 25-30% of total driving time spent on distracting activities. Commissioner Bulc, European Commissioner for Transport, recently warned against distraction caused by the use of mobile phone. She said, “Distraction
  • Gerd Leonhard to speak at TRA 2018 – the Digital Era of Transport
    January 30, 2018
    Gerd Leonhard: a key speaker at Transport Research Arena 2018 – TRA 2018 - in Vienna in April. International futurist Gerd Leonhard has been confirmed as a key speaker at this year’s Transport Research Arena 2018 in Vienna in April. To underline the visionary nature of TRA 2018, Leonhard - author and head of The Futures Agency - will speak at the opening session, exploring the importance of new technologies and the role of humans in the world of today’s digital mobility. From April 16-19, the 7th Transp
  • Eastern European highway and tunnel projects
    May 15, 2012
    Serbia’s Corridor 10 project, seen as key to the country’s future economic development, is 20 years behind schedule. With construction delayed and the matter being debated, the Serbian Ministry for Infrastructure, which reported the schedule delay, says the country is working as fast as possible, with 22km being built/year. The corridor will connect the country with its neighbours and provide an important route for through traffic.