Skip to main content

New Zealand’s massive infrastructure plans

Plans are in hand in New Zealand for a massive programme of infrastructure works around the country’s largest city, Auckland. The New Zealand Government intends to invest some US$7.8 billion (NZ$10 billion), which will be spent on upgrading existing highway links and building the second Auckland Harbour Bridge. The existing Auckland Harbour Bridge sees heavy traffic flows at peak periods in particular and the new structure is necessary to reduce congestion and cut journey times. The programme of infrastruct
July 1, 2013 Read time: 1 min
Plans are in hand in New Zealand for a massive programme of infrastructure works around the country’s largest city, Auckland. The New Zealand Government intends to invest some US$7.8 billion (NZ$10 billion), which will be spent on upgrading existing highway links and building the second Auckland Harbour Bridge. The existing Auckland Harbour Bridge sees heavy traffic flows at peak periods in particular and the new structure is necessary to reduce congestion and cut journey times. The programme of infrastructure works will also include a new railway link into the city, which is hoped will encourage commuters to take the train and leave their cars at home.

Related Content

  • Road link development for Auckland airport in New Zealand
    March 21, 2017
    New road development will help improve connections to New Zealand’s main international airport at Auckland. The work is expected to cost close to US$104 million and is intended to cut congestion around the airport and improve journey times to and from the facility, as well as boosting safety for road users. Improvements will be made to the roundabout at Landing Drive and the work should be complete by the end of 2017. The plan was announced recently by the New Zealand Transport Agency (NZTA).
  • Nepalese Government pushes ahead with transport infrastructure programme
    July 17, 2014
    The Nepalese Government has announced a major programme of transport infrastructure works for the 2014-2015 period. Road, highway and airport projects have all been prioritised. The detailed project report for the Kathmandu-Tarai Fast Track Road is to be completed within six months. The proposal aims to attract investors by guaranteeing a minimum number of vehicles using the tolled link. The project has been delayed due funding issues. This period will also see work being carried out the Mid-Hills Highway,
  • Russia sets out massive infrastructure growth plan
    December 16, 2021
    Russia has set out plans for massive infrastructure growth.
  • Procurement open for Northland Corridor
    March 26, 2025
    The Ara Tūhono/Warkworth-to-Te Hana section in New Zealand is the most advanced part of the corridor in terms of consents, property acquisition and design.