Skip to main content

New Zealand link

A major milestone has been achieved in New Zealand on a major road project that is intended to deal with a major traffic bottleneck in the city of Auckland. The launching gantry team has now installed the last segment of the new northbound viaduct, a key stage in the Newmarket Viaduct Replacement project. There is currently a 1.5m gap between the segments. So, on Saturday 3rd and Sunday 4th December the two viaducts will be cemented together in an 18 hour procedure known as the Stitch. From then until the e
May 15, 2012 Read time: 2 mins
RSSA major milestone has been achieved in New Zealand on a major road project that is intended to deal with a major traffic bottleneck in the city of Auckland. The launching gantry team has now installed the last segment of the new northbound viaduct, a key stage in the Newmarket Viaduct Replacement project. There is currently a 1.5m gap between the segments. So, on Saturday 3rd and Sunday 4th December the two viaducts will be cemented together in an 18 hour procedure known as the Stitch. From then until the end of January 2012, work will continue to prepare the new northbound half of the viaduct for traffic. The Switch of traffic to the new link will happen over the weekend of 28th-30th January 2012. The work has been on-going for some time and on 28th September 2009, the project team began the construction of the new southbound viaduct. In the two and a bit years since then, 468 concrete segments each weighing an average of 80tonnes have been cast in a yard in East Tamaki, transported to site, lifted into place, tensioned and secured to create the new southbound and new northbound viaducts. The project forms part of the Route 1 Southern Motorway, which feeds Auckland from the South and continues through the city and over the Harbour Bridge. The Route 16 Waterview tunnel will complete the Western motorway loop, which will enable through traffic to by-pass Auckland city altogether. This will reduce congestion over the bridge, the main transport link in all of New Zealand. The project will also incentivise heavy traffic to use the by-pass route, prolonging the life of the bridge. Eventually, the bridge will need to be replaced with a new bridge or a tunnel, and the existence of the by-pass will help to make that more feasible.

Related Content

  • Telvent wins Brisbane ITS contract
    May 3, 2012
    Telvent GIT has been awarded a contract by the Transcity JV, with Brisbane City Council as the end customer, to implement the ITS for Legacy Way (formerly Northern Link) in Australia. Legacy Way is a 4.6km road tunnel that will connect Brisbane’s western and inner northern suburbs, delivering travel time savings of up to 44 per cent when it opens. The ITS contract is valued at around US$32 million.
  • New Zealand road tunnel project wins IRF award
    January 18, 2013
    The Victoria Park Tunnel project in New Zealand has won an international award for construction methodology. The Victoria Park Alliance was presented with the 2012 International Road Federation (IRF) Global Road Achievement Award for Construction Methodology for the Victoria Park Tunnel project at an event in Washington, DC. The Alliance comprises the New Zealand Transport Agency, Fletcher Construction, Beca, Higgins Contractors and Parsons Brinckerhoff. Parsons Brinckerhoff was involved in concept design f
  • Cost effective road maintenance
    February 8, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports. Road maintenance is an increasingly important industry that spans a worldwide market. Awareness of the need for a stable and sustainable international infrastructure, maintenance and creative rural road technologies are taking a stronger role as viable sources for a cost-effective means of preserving, developing and prolonging the life of roads wit
  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.