Skip to main content

New Zealand highway project proving controversial

The East-West highway connection project in Auckland is proving controversial. Several community groups are lodging appeals against the US$1.37 billion (NZ$1.85 billion) project, despite it having been approved recently by the New Zealand: Government. The groups appealing against the highway link project now include Jackson Electrical, Mercury Energy, the Royal Forest and Bird Protection Society, iwi Ngati Whatua and The Onehunga Enhancement Society (TOES).
February 27, 2018 Read time: 1 min

The East-West highway connection project in Auckland is proving controversial. Several community groups are lodging appeals against the US$1.37 billion (NZ$1.85 billion) project, despite it having been approved recently by the New Zealand: Government. The groups appealing against the highway link project now include Jackson Electrical, Mercury Energy, the Royal Forest and Bird Protection Society, iwi Ngati Whatua and The Onehunga Enhancement Society (TOES). One of the issues of concern is that the project will require substantial coastal reclamation work. Several of the community groups believe that the reclamation may prove damaging and that alternative options for the route would be more suitable.

Related Content

  • New Zealand highway proposed
    June 15, 2021
    A potentially controversial tolled highway project has been proposed for New Zealand's South Island.
  • New Zealand bypass project attracts controversy
    July 18, 2019
    New Zealand’s Mount Messenger bypass project has attracted some controversy and opposition. The 5.2km route will cost around US$129 million (NZ$200 million) to construct and will include two bridges as well as a tunnel section. The alignment has been selected from five options as it minimise environmental damage. However there are complaints from environmentalists that the project will damage a 44ha area that includes forest and wetlands as well as posing a threat to some endangered bird life.
  • New Zealand arterial road project
    July 3, 2017
    The New Zealand Transport Agency (NZTA) plans to make its final decision on a major road for the capital city, Auckland. The project involves constructing a new arterial road link that will help cut congestion in the city and ease traffic flow, lowering journey times and pollution.
  • Auckland’s causeway project
    April 4, 2014
    When it is finished in early 2017, the causeway on Auckland’s North-western Motorway, State Highway 16, will have been raised 1.5m to stop flooding at extreme high tides. There will be four lanes city-bound and four/five lanes westbound with dedicated bus lanes in each direction, and the existing North-western cycleway that runs alongside it will be upgraded.