Skip to main content

New York’s new bridge opens

The second span of the New York’s new cable-stayed bridge has now been completed and has opened to traffic. The final span of the Governor Mario M Cuomo Bridge, which replaced the Tappan Zee Bridge, has now been opened to drivers. The opening was delayed slightly due to concerns over the state of a section of the old bridge, now being demolished. The new link was constructed by a joint venture headed by Fluor. With the new bridge opening, all four lanes of eastbound traffic shifted to the new second span. T
September 10, 2018 Read time: 2 mins
New York’s new bridge opening to traffic
The second span of the New York’s new cable-stayed bridge has now been completed and has opened to traffic. The final span of the Governor Mario M Cuomo Bridge, which replaced the Tappan Zee Bridge, has now been opened to drivers. The opening was delayed slightly due to concerns over the state of a section of the old bridge, now being demolished. The new link was constructed by a joint venture headed by 6343 Fluor. With the new bridge opening, all four lanes of eastbound traffic shifted to the new second span. The eastbound span consists of four general purpose traffic lanes, two emergency shoulders, space for a dedicated bus lane and an advanced traffic monitoring system.


The westbound bridge will remain in a temporary configuration while crews complete the bridge’s shared-use path connecting Westchester (New York) and Rockland (New York) counties for pedestrians and cyclists.

The New York State Thruway Authority, in partnership with the Fluor-led joint venture of Tappan Zee Constructors, LLC – comprised of 1021 American Bridge Company, Granite Construction Northeast, Inc. and Taylor Bros., Inc. – replaced the old bridge with a new 5km state-of-the-art, twin-span, cable-stayed bridge crossing the Hudson River between Westchester and Rockland counties. The cable-stayed main span is supported by eight 128m towers, which stand at 5° angles and feature a sleek, chamfered design. The iconic towers support 192 stay cables, which are made up of roughly 7,840km of steel strands.

The Governor Mario M Cuomo Bridge is one of the largest single design-build contracts for a transportation project in the United States and is the largest bridge project in New York state history.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Auckland Harbour bridge celebrates 50 years
    April 5, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road
  • Spencer wins Menai Suspension Bridge refurb
    September 16, 2022
    The UK contract, worth nearly €1.8 million, is to repaint the entire main span underdeck of the 417m-long bridge, the second oldest operational vehicular suspension bridge in the world.
  • Texas highway project awarded
    May 31, 2019
    A joint venture team has been awarded the US$1.7 billion I-635 LBJ East infrastructure project in Dallas, Texas. Fluor Corporation heads the joint venture, which also includes Balfour Beatty Infrastructure. The partners will carry out the contract to design and construct the I-635 LBJ East Project in Dallas for the Texas Department of Transportation (TxDOT). The scope of work includes the widening and full reconstruction of nearly 18km of the I-635 route, which is also known as LBJ Freeway. In addition, th