Skip to main content

New York’s new bridge opens

The second span of the New York’s new cable-stayed bridge has now been completed and has opened to traffic. The final span of the Governor Mario M Cuomo Bridge, which replaced the Tappan Zee Bridge, has now been opened to drivers. The opening was delayed slightly due to concerns over the state of a section of the old bridge, now being demolished. The new link was constructed by a joint venture headed by Fluor. With the new bridge opening, all four lanes of eastbound traffic shifted to the new second span. T
September 10, 2018 Read time: 2 mins
New York’s new bridge opening to traffic
The second span of the New York’s new cable-stayed bridge has now been completed and has opened to traffic. The final span of the Governor Mario M Cuomo Bridge, which replaced the Tappan Zee Bridge, has now been opened to drivers. The opening was delayed slightly due to concerns over the state of a section of the old bridge, now being demolished. The new link was constructed by a joint venture headed by 6343 Fluor. With the new bridge opening, all four lanes of eastbound traffic shifted to the new second span. The eastbound span consists of four general purpose traffic lanes, two emergency shoulders, space for a dedicated bus lane and an advanced traffic monitoring system.


The westbound bridge will remain in a temporary configuration while crews complete the bridge’s shared-use path connecting Westchester (New York) and Rockland (New York) counties for pedestrians and cyclists.

The New York State Thruway Authority, in partnership with the Fluor-led joint venture of Tappan Zee Constructors, LLC – comprised of 1021 American Bridge Company, Granite Construction Northeast, Inc. and Taylor Bros., Inc. – replaced the old bridge with a new 5km state-of-the-art, twin-span, cable-stayed bridge crossing the Hudson River between Westchester and Rockland counties. The cable-stayed main span is supported by eight 128m towers, which stand at 5° angles and feature a sleek, chamfered design. The iconic towers support 192 stay cables, which are made up of roughly 7,840km of steel strands.

The Governor Mario M Cuomo Bridge is one of the largest single design-build contracts for a transportation project in the United States and is the largest bridge project in New York state history.

For more information on companies in this article

Related Content

  • Tappan Zee takedown into the Hudson River
    January 17, 2019
    A controlled explosion demolished the eastern span of the old cantilever Tappan Zee Bridge across the Hudson River near New York City. The bridge, nearly 5km long, was opened in 1955 to carry traffic between the southern New England area and other regions west of the Hudson. Around 140,000 vehicles used the bridge daily. But the old bridge had deteriorated substantially and would have been too expensive to maintain or keep open for lighter traffic use. It became redundant after the new bridge of the
  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo