Skip to main content

New Vietnam highway construction starting

Construction work is starting on Vietnam’s Van Don-Mong Cai highway. Located in Quang Ninh Province in the north east of Vietnam, the 80km highway will feature two lanes in either direction. Costing US$471.6 million, the project is expected to take nearly two years to complete. The work is being carried out in joint venture by Cong Thanh Transportation and Construction Corporation, Van Don Sun JSC and Long Van Infrastructure Investment and Development Co. The project is expected to help develop tourism in t
March 5, 2019 Read time: 1 min

Construction work is starting on Vietnam’s Van Don-Mong Cai highway. Located in Quang Ninh Province in the north east of Vietnam, the 80km highway will feature two lanes in either direction. Costing US$471.6 million, the project is expected to take nearly two years to complete. The work is being carried out in joint venture by Cong Thanh Transportation and Construction Corporation, Van Don Sun JSC and Long Van Infrastructure Investment and Development Co. The project is expected to help develop tourism in the coastal province, which is famed for its scenic islands and beaches.

Related Content

  • Progress on Vietnam US$2bn transport infrastructure projects
    July 17, 2012
    Two major transport infrastructure projects in Vietnam with a combined value of more than US$2billion are a step closer to completion. A tender to appoint a contractor for the US$1.47billion Danang-Quang Ngai highway development has been published by Vietnam Expressway Corp (VEC).
  • Vietnam: North-South Expressway bidding
    November 17, 2022
    The package for the Can Tho-Hau Giang section has the biggest value, at US$320 million.
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the
  • Vietnam's road expansion
    May 28, 2012
    Vietnam is seeing significant expansion of its highway network at present, with another three major projects now moving forward and much of the financial backing coming from other Asian nations such as South Korea and Japan. A feasibility study is being carried out for the 94km Nghi Son-Bai Vot expressway and this should be complete by October 2010. The project is expected to cost US$1.04 billion and the expressway will have either six or four lanes, based on Transport Engineering Design's study.