Skip to main content

New UK motorway link under construction

Construction of a new junction on the M1 near Dunstable in Bedfordshire is starting in the UK. The new junction, junction 11A, is located just to the south of Toddington services and forms part of a new €225 million link road between the A5 and the M1 that will help to unlock growth and reduce congestion in the area. Work on the link road began in March.
June 18, 2015 Read time: 2 mins
The new link will cut congestion
Construction of a new junction on the M1 near Dunstable in Bedfordshire is starting in the UK. The new junction, junction 11A, is located just to the south of Toddington services and forms part of a new €225 million link road between the A5 and the M1 that will help to unlock growth and reduce congestion in the area. Work on the link road began in March.

8100 Highways England project manager Karen Green said, “This junction is a vital part of this significant road improvement. The new link road will be a major new bypass for Dunstable, reducing congestion and improving safety on the A5, and reducing pressure on the A5 through Dunstable town centre. Work on the project is progressing well.

“To build the junction we will need roadworks on the M1 between junctions 11 and 12, but we are working closely with our contractor and local partners to ensure disruption to road users during this work is kept to a minimum.”

Roads minister Andrew Jones said, “As part of our long-term economic plan we’re committed to the biggest investment in roads in a generation.

“It’s vital we use our transport infrastructure to create jobs and make it easier for people to see their family and friends. The £2 billion (€2.8 billion) we are investing in the East of England will ease congestion and make journeys quicker across the region.”

Once completed in spring 2017, the link road, a new 4.5km dual carriageway, will improve the east-west connection between the A5 and M1. While the new junction is being built, lane 3 on the M1 will be closed between junctions 11 and 12 in both directions. Three lanes will remain open, with traffic running on the hard shoulder and lanes 1 and 2. The roadworks, including safety barriers, signs, CCTV and average speed cameras, will stay in place throughout the junction construction work, which will be carried out in phases and should be finished in spring 2017 as the scheme nears completion.

For more information on companies in this article

Related Content

  • A wheely great bridge for the English city of Hull
    November 6, 2019
    A 60m pre-constructed pedestrian bridge weighing 150 tonnes as been wheeled into position over the A63 in the northern English city of Hull. The covered and vaulted Princess Quays Bridge will be renamed when it opens in the spring enabling pedestrians and cyclists to cross over the busy dual carriageway. The positioning operation meant that first the route was cleared of signage, guardrails and street lights. The bridge was then lowered onto two wheeled transporters – one at each end of the structur
  • FTA delighted with €500million plus boost to NI transport infrastructure
    March 15, 2012
    An imminent €500million plus cash injection into Northern Ireland transport infrastructure will lead to lower fuel costs, quicker journey times and greater overseas investment, according to the Freight Transport Association (FTA).
  • TfL opts for RedSpeed safety cameras
    September 23, 2014
    RedSpeed International is to supply around 600 speed and red light safety cameras to Transport for London (TfL). The award is the result of a process which started in August 2012 and will see the company’s SpeedCurb and RedSpeed products progressively installed with a completion date of October 2016. The installation of the RedSpeed digital red light camera replacement in London has already started. The cameras not only enforce against red light running, but also monitor and enforce against vehicles brea
  • Lower Thames Crossing gets green light
    March 26, 2025
    The 14.5-mile project near London will include a 2.6-mile tunnel under the Thames River and come at a cost of around £8.3 billion.