Skip to main content

New UK motorway link under construction

Construction of a new junction on the M1 near Dunstable in Bedfordshire is starting in the UK. The new junction, junction 11A, is located just to the south of Toddington services and forms part of a new €225 million link road between the A5 and the M1 that will help to unlock growth and reduce congestion in the area. Work on the link road began in March.
June 18, 2015 Read time: 2 mins
The new link will cut congestion
Construction of a new junction on the M1 near Dunstable in Bedfordshire is starting in the UK. The new junction, junction 11A, is located just to the south of Toddington services and forms part of a new €225 million link road between the A5 and the M1 that will help to unlock growth and reduce congestion in the area. Work on the link road began in March.

8100 Highways England project manager Karen Green said, “This junction is a vital part of this significant road improvement. The new link road will be a major new bypass for Dunstable, reducing congestion and improving safety on the A5, and reducing pressure on the A5 through Dunstable town centre. Work on the project is progressing well.

“To build the junction we will need roadworks on the M1 between junctions 11 and 12, but we are working closely with our contractor and local partners to ensure disruption to road users during this work is kept to a minimum.”

Roads minister Andrew Jones said, “As part of our long-term economic plan we’re committed to the biggest investment in roads in a generation.

“It’s vital we use our transport infrastructure to create jobs and make it easier for people to see their family and friends. The £2 billion (€2.8 billion) we are investing in the East of England will ease congestion and make journeys quicker across the region.”

Once completed in spring 2017, the link road, a new 4.5km dual carriageway, will improve the east-west connection between the A5 and M1. While the new junction is being built, lane 3 on the M1 will be closed between junctions 11 and 12 in both directions. Three lanes will remain open, with traffic running on the hard shoulder and lanes 1 and 2. The roadworks, including safety barriers, signs, CCTV and average speed cameras, will stay in place throughout the junction construction work, which will be carried out in phases and should be finished in spring 2017 as the scheme nears completion.

For more information on companies in this article

Related Content

  • Key A14 upgrade for the UK to cut congestion
    September 11, 2013
    A joint venture comprising BAM Nuttall and Morgan Sindall will carry out the 4km widening of the UK’s heavily congested A14 route. The €28.5 million (£24 million) project is being carried out for the Highways Agency to reduce journey times more reliable, improve safety and support proposed local development. Mott MacDonald will carry out the design work for the project. Junctions 7-9 of the A14 are highly congested at present due to a combination of heavy commuter traffic and the high percentage of HGVs car
  • Progress delayed on Kenya's vital highway link
    February 16, 2012
    Kenya is investing in road developments , reports Shem Oirere. A multi-million dollar highway expansion project in Kenya's capital Nairobi may now be delayed for close to a year because of a huge underground network of water, electricity and communication pipes and cables that has slowed down construction works.
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Stonehenge tunnel preferred bidder announced
    May 27, 2022
    The preferred bidder has been announced for the UK’s Stonehenge tunnel.