Skip to main content

New UK dual carriageway opening

Drivers in the UK are to benefit from the opening of a new dual carriageway connection. The section of road is a key route for Highways England, improving the connection between junction 19 of the M6 and junction 7 of the M56 motorways. The new A556 Knutsford to Bowdon link road will cut congestion and journey times for drivers in the area. As part of the £192 million project to build the new dual carriageway between, Highways England has remodelled slip roads at Yarwood Heath and Bowdon roundabouts. The
December 20, 2016 Read time: 2 mins
Drivers in the UK are to benefit from the opening of a new dual carriageway connection. The section of road is a key route for 8100 Highways England, improving the connection between junction 19 of the M6 and junction 7 of the M56 motorways. The new A556 Knutsford to Bowdon link road will cut congestion and journey times for drivers in the area. As part of the £192 million project to build the new dual carriageway between, Highways England has remodelled slip roads at Yarwood Heath and Bowdon roundabouts.

The new dual carriageway is part of a £15 billion investment by the UK Government in motorways and major A roads by 2021, which is being delivered by Highways England as part of the Northern Powerhouse initiative.

Overnight working will mean that by Monday 26th December 2016, drivers leaving the northbound A556 will have direct access onto the eastbound M56 and motorists leaving the westbound M56 will get direct access onto the southbound A556. This will benefit drivers who had to previously negotiate traffic lights and or Bowdon roundabout. The roundabout will now solely be used by drivers joining or leaving the local road network.

This weekend’s work will also mark the re-opening of the M56 eastbound exit slip road at junction 7 after a 5-month closure - with drivers sent onto the new Bowdon roundabout for access to the southbound A556 or local road network, including the A56 local roads for Bowdon and Altrincham. All the new arrangements will be tied-in to the new A556 dual carriageway ahead of its opening in the spring.

The remodelling of slip road arrangements between the existing A556 and junction 7 of the M56 has involved pairing the existing Bowdon roundabout with a new, smaller roundabout which opened in September. The 2 roundabouts are linked by a new bridge – with the new link roads between the A556 and M56 travelling under this.

Construction of the new A556 link road, between the M56 and the M6, started in November 2014 and is due for completion in spring next year.

For more information on companies in this article

Related Content

  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • David Quarmby will be a keynote speaker at ERIC 2016 in Leeds
    July 26, 2016
    David Quarmby, one of the United Kingdom’s most influential and experienced highways and transport senior executives, has been confirmed as a keynote speaker at the European Roads Infrastructure Congress – ERIC 2016 - in the autumn. Quarmby has had a long career in policy, planning, management and research in UK transport, with 39 years’ board-level experience in government, public agencies and the private sector, including London Transport and the retail food giant Sainsbury’s. Most recently he has b
  • Let’s go party
    October 3, 2018
    Some friends in the US decided to turn a toy Barbie Mustang car into something rather more entertaining. The men fitted a Honda motorcycle engine and new driveline components, including go-kart tyres. This allowed a top speed of 115km/h, which it could reach in just six seconds, making it rather lively and spirited and also difficult to control. The vehicle is definitely not likely to be made road legal any time soon and nor is a model with a similar performance ever likely to be available from the original
  • Balfour Beatty wins road contract for Norfolk
    November 27, 2015
    Balfour Beatty has been awarded a €147.72 million (£104 million) road scheme by Norfolk County Council to complete works on the Norwich Northern Distributor Road (NNDR). The new road will serve Broadland, Norfolk, and improve access to North Norfolk and Norwich International Airport, with better links to Great Yarmouth and the south of the region. It will also bring relief on congested and unsuitable roads around the north and east of Norwich and improve capacity for future growth in jobs and housing.