Skip to main content

New UK dual carriageway opening

Drivers in the UK are to benefit from the opening of a new dual carriageway connection. The section of road is a key route for Highways England, improving the connection between junction 19 of the M6 and junction 7 of the M56 motorways. The new A556 Knutsford to Bowdon link road will cut congestion and journey times for drivers in the area. As part of the £192 million project to build the new dual carriageway between, Highways England has remodelled slip roads at Yarwood Heath and Bowdon roundabouts. The
December 20, 2016 Read time: 2 mins
Drivers in the UK are to benefit from the opening of a new dual carriageway connection. The section of road is a key route for 8100 Highways England, improving the connection between junction 19 of the M6 and junction 7 of the M56 motorways. The new A556 Knutsford to Bowdon link road will cut congestion and journey times for drivers in the area. As part of the £192 million project to build the new dual carriageway between, Highways England has remodelled slip roads at Yarwood Heath and Bowdon roundabouts.

The new dual carriageway is part of a £15 billion investment by the UK Government in motorways and major A roads by 2021, which is being delivered by Highways England as part of the Northern Powerhouse initiative.

Overnight working will mean that by Monday 26th December 2016, drivers leaving the northbound A556 will have direct access onto the eastbound M56 and motorists leaving the westbound M56 will get direct access onto the southbound A556. This will benefit drivers who had to previously negotiate traffic lights and or Bowdon roundabout. The roundabout will now solely be used by drivers joining or leaving the local road network.

This weekend’s work will also mark the re-opening of the M56 eastbound exit slip road at junction 7 after a 5-month closure - with drivers sent onto the new Bowdon roundabout for access to the southbound A556 or local road network, including the A56 local roads for Bowdon and Altrincham. All the new arrangements will be tied-in to the new A556 dual carriageway ahead of its opening in the spring.

The remodelling of slip road arrangements between the existing A556 and junction 7 of the M56 has involved pairing the existing Bowdon roundabout with a new, smaller roundabout which opened in September. The 2 roundabouts are linked by a new bridge – with the new link roads between the A556 and M56 travelling under this.

Construction of the new A556 link road, between the M56 and the M6, started in November 2014 and is due for completion in spring next year.

For more information on companies in this article

Related Content

  • New highway works planned for India
    February 10, 2025
    Major new highway works are planned for India.
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.