Skip to main content

New UK dual carriageway opening

Drivers in the UK are to benefit from the opening of a new dual carriageway connection. The section of road is a key route for Highways England, improving the connection between junction 19 of the M6 and junction 7 of the M56 motorways. The new A556 Knutsford to Bowdon link road will cut congestion and journey times for drivers in the area. As part of the £192 million project to build the new dual carriageway between, Highways England has remodelled slip roads at Yarwood Heath and Bowdon roundabouts. The
December 20, 2016 Read time: 2 mins
Drivers in the UK are to benefit from the opening of a new dual carriageway connection. The section of road is a key route for 8100 Highways England, improving the connection between junction 19 of the M6 and junction 7 of the M56 motorways. The new A556 Knutsford to Bowdon link road will cut congestion and journey times for drivers in the area. As part of the £192 million project to build the new dual carriageway between, Highways England has remodelled slip roads at Yarwood Heath and Bowdon roundabouts.

The new dual carriageway is part of a £15 billion investment by the UK Government in motorways and major A roads by 2021, which is being delivered by Highways England as part of the Northern Powerhouse initiative.

Overnight working will mean that by Monday 26th December 2016, drivers leaving the northbound A556 will have direct access onto the eastbound M56 and motorists leaving the westbound M56 will get direct access onto the southbound A556. This will benefit drivers who had to previously negotiate traffic lights and or Bowdon roundabout. The roundabout will now solely be used by drivers joining or leaving the local road network.

This weekend’s work will also mark the re-opening of the M56 eastbound exit slip road at junction 7 after a 5-month closure - with drivers sent onto the new Bowdon roundabout for access to the southbound A556 or local road network, including the A56 local roads for Bowdon and Altrincham. All the new arrangements will be tied-in to the new A556 dual carriageway ahead of its opening in the spring.

The remodelling of slip road arrangements between the existing A556 and junction 7 of the M56 has involved pairing the existing Bowdon roundabout with a new, smaller roundabout which opened in September. The 2 roundabouts are linked by a new bridge – with the new link roads between the A556 and M56 travelling under this.

Construction of the new A556 link road, between the M56 and the M6, started in November 2014 and is due for completion in spring next year.

For more information on companies in this article

Related Content

  • Colas eases congestion with new Thornbury Barracks roundabout
    April 27, 2015
    In the UK, Colas is near completion of the Thornbury Barracks roundabout aimed to reduce traffic congestion on the A647 highway, the principal link between Leeds and Bradford in the county of West Yorkshire. Traffic signals have been placed on the junction, with central running lanes constructed through the previous roundabout. Michael Holmes, Colas business manager for the Leeds area, explained there was a need to infill a local pedestrian subway underpass using foam concrete, and option not previously u
  • Fast bridge building in Tennessee
    July 5, 2016
    The Tennessee Department of Transportation (TDOT) recently completed the Fast Fix 8 bridge project in Nashville, with help from a Power Curbers slipformer belonging to Irwin Concrete Construction. TDOT’s goal was to replace eight ageing interstate bridges along Interstate 40 through Nashville using a process called Accelerated Bridge Construction (ABC). This uses fast-paced, around-the-clock work to limit road closures and speed up bridge completion, impacting surrounding communities as little as possibl
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • The most dangerous times on US roads
    July 2, 2018
    Newly available data from the Insurance Institute for Highway Studies (IIHS) shows the most dangerous days for drivers on US roads. The research studied fatal crashes that occurred between 1998 and 2014, revealing that summer and early Autumn have the highest rates of fatal road crashes. The risk of crashing is higher at the weekend than during the working week, with the 3pm to 7pm time slot having a particularly high risk of road fatalities. Most dangerous of all are New Year’s Day and the US Independence