Skip to main content

New UK dual carriageway opening

Drivers in the UK are to benefit from the opening of a new dual carriageway connection. The section of road is a key route for Highways England, improving the connection between junction 19 of the M6 and junction 7 of the M56 motorways. The new A556 Knutsford to Bowdon link road will cut congestion and journey times for drivers in the area. As part of the £192 million project to build the new dual carriageway between, Highways England has remodelled slip roads at Yarwood Heath and Bowdon roundabouts. The
December 20, 2016 Read time: 2 mins
Drivers in the UK are to benefit from the opening of a new dual carriageway connection. The section of road is a key route for 8100 Highways England, improving the connection between junction 19 of the M6 and junction 7 of the M56 motorways. The new A556 Knutsford to Bowdon link road will cut congestion and journey times for drivers in the area. As part of the £192 million project to build the new dual carriageway between, Highways England has remodelled slip roads at Yarwood Heath and Bowdon roundabouts.

The new dual carriageway is part of a £15 billion investment by the UK Government in motorways and major A roads by 2021, which is being delivered by Highways England as part of the Northern Powerhouse initiative.

Overnight working will mean that by Monday 26th December 2016, drivers leaving the northbound A556 will have direct access onto the eastbound M56 and motorists leaving the westbound M56 will get direct access onto the southbound A556. This will benefit drivers who had to previously negotiate traffic lights and or Bowdon roundabout. The roundabout will now solely be used by drivers joining or leaving the local road network.

This weekend’s work will also mark the re-opening of the M56 eastbound exit slip road at junction 7 after a 5-month closure - with drivers sent onto the new Bowdon roundabout for access to the southbound A556 or local road network, including the A56 local roads for Bowdon and Altrincham. All the new arrangements will be tied-in to the new A556 dual carriageway ahead of its opening in the spring.

The remodelling of slip road arrangements between the existing A556 and junction 7 of the M56 has involved pairing the existing Bowdon roundabout with a new, smaller roundabout which opened in September. The 2 roundabouts are linked by a new bridge – with the new link roads between the A556 and M56 travelling under this.

Construction of the new A556 link road, between the M56 and the M6, started in November 2014 and is due for completion in spring next year.

For more information on companies in this article

Related Content

  • The Highways Agency aims to address workzone crashes
    April 10, 2013
    The UK’s Highways Agency is telling drivers to take extra care and to stick speed limits at roadworks, to prevent deaths and injuries among both road users and road workers. Eight road workers have been killed in the last three years while improving and maintaining the strategic road network in England. In addition there are many near misses, with members of the public driving through coned off areas or colliding with works vehicles. The UK Government is investing additional funding in road improvements acr
  • More tenders for Lower Thames Crossing
    April 1, 2021
    The winners will build 23km of road connecting to the UK’s longest road tunnel.
  • High-tech, high places: 3M in US and MetService in New Zealand
    August 1, 2017
    The US state of Michigan sets up a high-tech test road while New Zealand’s transport officials buy in some high-tech weather forecasting. The road safety division of 3M will provide the US state of Michigan with lane markings and retroreflective signs for a connected vehicle technologies trial along the I-75 highway. Around 5km of the Interstate 75 work zone in Oakland County will be transformed over the next four months to improve safety for drivers and test advanced vehicle-to-infrastructure technologie
  • First section of new Texas route opening
    November 21, 2017
    The first stretch of a highway development project in Texas is now open. New southbound toll lanes have been built for the Texas 288 project, running between downtown Houston and the Brazoria County line. The existing southbound traffic is being shifted to these lanes on a temporary basis between Holly Hall and Loop 610. But drivers are not being tolled at present. The US$815 million work is due for completion in 2019, when the tolling system will come into full use. The project involves widening the route