Skip to main content

New UK bypass to ease roundabout congestion?

A €61.13 million (£50 million) bypass could be created on the edge of a city in east England to ease the pressure on a heavily used roundabout. The radical proposals have been drawn up as council bosses look to find a long-term solution for the Thickthorn roundabout, near Norwich, reportedly described by one leading figure as “one of the most important roundabouts in the county [Norfolk]”.
February 17, 2014 Read time: 3 mins
A €61.13 million (£50 million) bypass could be created on the edge of a city in east England to ease the pressure on a heavily used roundabout.

The radical proposals have been drawn up as council bosses look to find a long-term solution for the Thickthorn roundabout, near Norwich, reportedly described by one leading figure as “one of the most important roundabouts in the county [Norfolk]”.

That roundabout is already one of the Norfolk’s busiest and will come under even more pressure when the thousands of homes earmarked for Norfolk over the next two decades are built.

To plan for that, Norfolk County Council asked consultants Mott McDonald to look into possible solutions.

They came up with a number of schemes, but the one they identified as the best solution is for a multi-million euro project which would see a new tunnel created under the A11 and a new bridge over the A47 southern bypass.

A new slip road would come off the Norwich-bound A11 approaching the roundabout and go under the A11, before sweeping over the bridge over the southern bypass and joining up with the Round House roundabout near Cringleford.

Traffic heading out of Norwich would have the option of coming off the Round House roundabout, crossing the A47 over the new bridge and joining the A11 beyond Thickthorn roundabout.

The council acknowledges it will have to convince the government to get the money for the scheme, but is ready to spend €978,100-€1.22 million for a further two-year feasibility study into the bypass and other options.

David Harrison, cabinet member for environment, transport and waste at Norfolk County Council, said, “The county council recognises the crucial importance of the Thickthorn junction and is keen to see improvements in capacity made, given the growth agenda for Norwich in the years ahead.

“We have therefore commissioned further work by 2579 Mott MacDonald to underline the importance the county council attaches to the junction to support further dialogue with the 2309 Highways Agency.

“At a time when funding is at a premium, we will keep up the pressure to ensure Norfolk receives its fair share of funding to allow our economy to grow in a managed way.”

Chris Starkie, New Anglia LEP managing director, said the predicted growth in and around Norwich, and the expansion plans for Norwich Research Park, meant the junction would have to be improved.

He said, “Thickthorn junction is probably one of the most important roundabouts in Norfolk. It is the gateway to Norwich and the link between the A11 and the A47.

“Norfolk County Council, working with us, will be pushing the Highways Agency to fund necessary improvements as a matter of urgency.”

The Highways Agency, which has responsibility for maintaining the roundabout, confirmed it was talking to the county council about a long-term solution.

But the agency did reveal resurfacing work and improvements to the existing roundabout and its roads is due to start next month.

A spokeswoman said, “We are committed to safe and reliable journeys for road users. Work to improve the Thickthorn roundabout on the A11 by resurfacing it, and replacing all road markings and road studs is currently planned to be carried out next month.

“We will also make some changes to improve lane discipline around the junction. Details will be publicised in advance.”

For more information on companies in this article

Related Content

  • SBS modified asphalt delivers added benefits
    February 17, 2012
    Special additives are used in asphalt mixes to give them added benefits as Patrick Smith reports
  • Video: North Tyneside’s triple decker Silverlink on schedule
    August 29, 2018
    Highways England reports that the Silverlink triple-deck roundabout in North Tyneside is 80% complete and on schedule for opening in March next year. The €83 million project involves lowering the A19 highway underneath the Silverlink roundabout and A1058 Coast Road. The new road is expected to be used by 35,400 vehicles daily. “We are now entering the final stages,” said Steven Cox, Highways England assistant project manager. “Work to remove the 80,000m³ of soil has now been completed [and] we have six m
  • Workzones benefit from new mobile speed enforcement technology
    April 11, 2012
    A variety of new technology for temporary speed zones during major highway projects across the globe is about to hit the market, while other proven systems remain in demand. Guy Woodford reports The D-Cam P is one of four new mobile speed reading products for temporary speed zones being launched this month by Truvelo. Deployable solely as a speed camera or at a red light intersection to monitor red light offences, the D-Cam P can also act as a speed camera on the green and amber light phases. The machin
  • JCB excavators JS220 and 370 work close to home
    May 14, 2018
    A fleet of JCB excavators is playing a major role in a road construction project only metres from the factory where they were built. Derbyshire-based earthmoving specialist JC Balls is working for a Carillion-Tarmac joint venture on the A50 Growth Corridor Project A. The contract is part of the National Infrastructure Plan and consists of constructing a grade-separated junction on the A50 dual carriageway to the west of the town of Uttoxeter. Project managed by Amey, the scheme is creating three new