Skip to main content

New UK bypass to ease roundabout congestion?

A €61.13 million (£50 million) bypass could be created on the edge of a city in east England to ease the pressure on a heavily used roundabout. The radical proposals have been drawn up as council bosses look to find a long-term solution for the Thickthorn roundabout, near Norwich, reportedly described by one leading figure as “one of the most important roundabouts in the county [Norfolk]”.
February 17, 2014 Read time: 3 mins
A €61.13 million (£50 million) bypass could be created on the edge of a city in east England to ease the pressure on a heavily used roundabout.

The radical proposals have been drawn up as council bosses look to find a long-term solution for the Thickthorn roundabout, near Norwich, reportedly described by one leading figure as “one of the most important roundabouts in the county [Norfolk]”.

That roundabout is already one of the Norfolk’s busiest and will come under even more pressure when the thousands of homes earmarked for Norfolk over the next two decades are built.

To plan for that, Norfolk County Council asked consultants Mott McDonald to look into possible solutions.

They came up with a number of schemes, but the one they identified as the best solution is for a multi-million euro project which would see a new tunnel created under the A11 and a new bridge over the A47 southern bypass.

A new slip road would come off the Norwich-bound A11 approaching the roundabout and go under the A11, before sweeping over the bridge over the southern bypass and joining up with the Round House roundabout near Cringleford.

Traffic heading out of Norwich would have the option of coming off the Round House roundabout, crossing the A47 over the new bridge and joining the A11 beyond Thickthorn roundabout.

The council acknowledges it will have to convince the government to get the money for the scheme, but is ready to spend €978,100-€1.22 million for a further two-year feasibility study into the bypass and other options.

David Harrison, cabinet member for environment, transport and waste at Norfolk County Council, said, “The county council recognises the crucial importance of the Thickthorn junction and is keen to see improvements in capacity made, given the growth agenda for Norwich in the years ahead.

“We have therefore commissioned further work by 2579 Mott MacDonald to underline the importance the county council attaches to the junction to support further dialogue with the 2309 Highways Agency.

“At a time when funding is at a premium, we will keep up the pressure to ensure Norfolk receives its fair share of funding to allow our economy to grow in a managed way.”

Chris Starkie, New Anglia LEP managing director, said the predicted growth in and around Norwich, and the expansion plans for Norwich Research Park, meant the junction would have to be improved.

He said, “Thickthorn junction is probably one of the most important roundabouts in Norfolk. It is the gateway to Norwich and the link between the A11 and the A47.

“Norfolk County Council, working with us, will be pushing the Highways Agency to fund necessary improvements as a matter of urgency.”

The Highways Agency, which has responsibility for maintaining the roundabout, confirmed it was talking to the county council about a long-term solution.

But the agency did reveal resurfacing work and improvements to the existing roundabout and its roads is due to start next month.

A spokeswoman said, “We are committed to safe and reliable journeys for road users. Work to improve the Thickthorn roundabout on the A11 by resurfacing it, and replacing all road markings and road studs is currently planned to be carried out next month.

“We will also make some changes to improve lane discipline around the junction. Details will be publicised in advance.”

For more information on companies in this article

Related Content

  • Naylor drains away waste water concerns
    January 26, 2017
    A bespoke waste water drainage system saved time and money on a recent UK motorway scheme Work on the London’s M25 motorway Junction 30/A13 Corridor Relieving Congestion Scheme is being undertaken by joint venture contractor Balfour Beatty/Skanska. The project is valued at nearly €91 million and completion is for autumn 2016. There has been a successful continual programme of clean-up using road-sweeper/gulley cleaning trucks to remove detritus from the works areas. Disposal of this type of waste w
  • Funding road research in Kenya as infrastructure development grows
    August 14, 2017
    The demand for road construction material research and testing services in Kenya is expected to soar. The East African country is going through a construction boom, despite policy and financial challenges facing public institutions overseeing the research and testing operations in the transport industry. “Kenya is going through a construction boom and so is the demand for construction material testing services,” said Juma Ali Madzitsa, Geotechnical Lab Supervisor at SGS Kenya, a subsidiary of Swiss based in
  • Norway’s record breaking undersea road tunnel
    February 25, 2015
    The world's deepest road tunnel is currently in construction near Stavanger in Norway but is only the prelude to even larger projects - report and photographs by Adrian Greeman. Norway's convoluted coastline of fjords and high mountains is famously scenic but also a major problem for transport and connections. The country has long experience of constructing tunnels as a result. Now a series of tunnels underway, or in design, around the oil industry city of Stavanger will stretch its skills more than usual.
  • New techniques for tackling congestion
    December 8, 2015
    Transport experts from the Royal Academy of Engineering are proposing methods to reduce traffic congestion. These proposals are included in a discussion document intended to stimulate debate on congestion issues. The working group behind the paper includes industry experts and academic researcher. The team looked at technology and policy measures that could reduce congestion in the most critical transport sectors by 2030, evaluating which measures would be effective and value for money.