Skip to main content

New UK bypass to ease roundabout congestion?

A €61.13 million (£50 million) bypass could be created on the edge of a city in east England to ease the pressure on a heavily used roundabout. The radical proposals have been drawn up as council bosses look to find a long-term solution for the Thickthorn roundabout, near Norwich, reportedly described by one leading figure as “one of the most important roundabouts in the county [Norfolk]”.
February 17, 2014 Read time: 3 mins
A €61.13 million (£50 million) bypass could be created on the edge of a city in east England to ease the pressure on a heavily used roundabout.

The radical proposals have been drawn up as council bosses look to find a long-term solution for the Thickthorn roundabout, near Norwich, reportedly described by one leading figure as “one of the most important roundabouts in the county [Norfolk]”.

That roundabout is already one of the Norfolk’s busiest and will come under even more pressure when the thousands of homes earmarked for Norfolk over the next two decades are built.

To plan for that, Norfolk County Council asked consultants Mott McDonald to look into possible solutions.

They came up with a number of schemes, but the one they identified as the best solution is for a multi-million euro project which would see a new tunnel created under the A11 and a new bridge over the A47 southern bypass.

A new slip road would come off the Norwich-bound A11 approaching the roundabout and go under the A11, before sweeping over the bridge over the southern bypass and joining up with the Round House roundabout near Cringleford.

Traffic heading out of Norwich would have the option of coming off the Round House roundabout, crossing the A47 over the new bridge and joining the A11 beyond Thickthorn roundabout.

The council acknowledges it will have to convince the government to get the money for the scheme, but is ready to spend €978,100-€1.22 million for a further two-year feasibility study into the bypass and other options.

David Harrison, cabinet member for environment, transport and waste at Norfolk County Council, said, “The county council recognises the crucial importance of the Thickthorn junction and is keen to see improvements in capacity made, given the growth agenda for Norwich in the years ahead.

“We have therefore commissioned further work by 2579 Mott MacDonald to underline the importance the county council attaches to the junction to support further dialogue with the 2309 Highways Agency.

“At a time when funding is at a premium, we will keep up the pressure to ensure Norfolk receives its fair share of funding to allow our economy to grow in a managed way.”

Chris Starkie, New Anglia LEP managing director, said the predicted growth in and around Norwich, and the expansion plans for Norwich Research Park, meant the junction would have to be improved.

He said, “Thickthorn junction is probably one of the most important roundabouts in Norfolk. It is the gateway to Norwich and the link between the A11 and the A47.

“Norfolk County Council, working with us, will be pushing the Highways Agency to fund necessary improvements as a matter of urgency.”

The Highways Agency, which has responsibility for maintaining the roundabout, confirmed it was talking to the county council about a long-term solution.

But the agency did reveal resurfacing work and improvements to the existing roundabout and its roads is due to start next month.

A spokeswoman said, “We are committed to safe and reliable journeys for road users. Work to improve the Thickthorn roundabout on the A11 by resurfacing it, and replacing all road markings and road studs is currently planned to be carried out next month.

“We will also make some changes to improve lane discipline around the junction. Details will be publicised in advance.”

For more information on companies in this article

Related Content

  • Beatty awarded H Agency Hull A63 Improvement Scheme
    August 8, 2014
    Balfour Beatty’s UK construction business has been awarded the €94.45 million (£75 million) A63 Castle Street improvement scheme in Hull for the Highways Agency under an Early Contractor Involvement (ECI) design and build contract. The 1.5km scheme in the centre of the city in East Yorkshire, northern England will improve journey times for road users through conversion of a major interchange into a split level junction with a two-lane dual carriageway carrying east-west traffic below north-south traffic in
  • Cleaner engines, reduced emissions
    February 17, 2012
    The forthcoming Tier 4 emissions legislation represents a great leap forward in technology, Mike Woof reports
  • Cleaner engines, reduced emissions
    April 11, 2012
    The forthcoming Tier 4 emissions legislation represents a great leap forward in technology, Mike Woof reports A high-profile focus on sustainability and reduced environmental impact is sweeping the construction sector in the European Union (EU) and the US. The EU and the US will implement regulations for the lowest emission off-road machines in history, with Canada and Japan expected to release similar regulatory programmes this year. The legislation being introduced will transform the construction indu
  • Algeria signs off two contracts of Hauts Plateaux motorway work
    January 5, 2015
    The Algerian Council of Ministers has approved two contracts for stretches of road on the Hauts Plateaux motorway. No details of the contractors were given for the work that is to link Lambidiri to Draa Lahmar via Ouled Fadhel. Construction is expected to take 18 months. Last March, World Highways reported that work on the 1,000km Hauts-Plateaux motorway project was to begin that month. Construction cost for motorway’s 10 sections was estimated to be around US$8.94 billion, according to Algerian Minis