Skip to main content

New Tyne Tunnel

The organisations behind the New Tyne Crossing project have commissioned the new Tyne Tunnel in north-east England.
February 21, 2012 Read time: 1 min
The organisations behind the New Tyne Crossing project have commissioned the new Tyne Tunnel in north-east England.
The immersed tube vehicle tunnel, built as part of the £260 million (€306 million) New Tyne Crossing project, will initially provide one lane of traffic in each direction with traffic being transferred into the new tunnel to enable the original 1967-built tunnel under the River Tyne to close for a ten-month refurbishment.
Councillor David Wood, chairman of the 1436 Tyne and Wear Integrated Transport Authority (TWITA), the project promoter, said: “It is incredibly exciting to be on the brink of this milestone event for the New Tyne Crossing project. As only the third tunnel of its kind in Britain we should not underestimate the achievement that has been made in reaching this stage.”
TT2 is concessionaire for the New Tyne Crossing on which main construction work began in October 2008. Both tunnels under the river connect to the A19 in East Howdon, north of the Tyne with the A19 through Jarrow in the south. On completion of the project will complete the dualling of the A19.

For more information on companies in this article

Related Content

  • Sealing the world's longest tunnel
    May 8, 2012
    Infrastructure construction in China is booming as never before, but sealing the world’s longest immersed tunnel is a technically complex engineering project. The impressive Hong Kong-Zhuhai-Macau fixed link project in China includes an immersed tunnel with a record-breaking length of almost 7km. In 2009 construction began on a project to link the island of Hong Kong with Macau and the mainland Chinese city of Zhuhai. The link will be one of the region’s most technically complex engineering projects ever. I
  • New bridge being planned for German city Bonn
    July 16, 2018
    A new bridge project is being planned for the German city of Bonn. The city has three bridges crossing the Rhein River, the North, South and Kennedy Bridges. The North Bridge is in need of replacement as it is no longer able to meet the city’s traffic needs. The existing structure will be demolished and replaced with a new bridge in a project worth €205 million. Plans should be ready for the new link in 2020, with construction expected to commence in 2028.
  • Sandvik tunnelling equipment boosts Sochi 2014
    August 28, 2013
    Sandvik Construction is among leading equipment manufacturers playing a key role in building a network of road and rail tunnels on one new and one existing transport route in and around the Russian coastal city of Sochi as part of a US$47.75 billion investment in preparations for the Sochi 2014 Winter Olympics. Guy Woodford reports Sandvik Construction’s tunnelling equipment team in Russia have been very much in demand over the past three years. Since 2010, they have been overseeing the seven Russian c
  • JCB North America has new chief after John Patterson CBE retires
    January 7, 2014
    JCB’s John Patterson CBE, who rose through the ranks from field service engineer to Group chief executive, has retired after 43 years’ service. Arjun Mirdha is the new president and CEO of JCB in North America, where Patterson had led operations as chairman and CEO since 2008. After joining JCB in 1971, Patterson went on to work in Canada and America before returning to the UK in 1988 as managing director of JCB Service. In 1993, he was appointed managing director of JCB Sales before becoming Group CEO –