Skip to main content

New Tyne Tunnel

The organisations behind the New Tyne Crossing project have commissioned the new Tyne Tunnel in north-east England.
February 21, 2012 Read time: 1 min
The organisations behind the New Tyne Crossing project have commissioned the new Tyne Tunnel in north-east England.
The immersed tube vehicle tunnel, built as part of the £260 million (€306 million) New Tyne Crossing project, will initially provide one lane of traffic in each direction with traffic being transferred into the new tunnel to enable the original 1967-built tunnel under the River Tyne to close for a ten-month refurbishment.
Councillor David Wood, chairman of the 1436 Tyne and Wear Integrated Transport Authority (TWITA), the project promoter, said: “It is incredibly exciting to be on the brink of this milestone event for the New Tyne Crossing project. As only the third tunnel of its kind in Britain we should not underestimate the achievement that has been made in reaching this stage.”
TT2 is concessionaire for the New Tyne Crossing on which main construction work began in October 2008. Both tunnels under the river connect to the A19 in East Howdon, north of the Tyne with the A19 through Jarrow in the south. On completion of the project will complete the dualling of the A19.

For more information on companies in this article

Related Content

  • Chile’s new urban highway link
    May 2, 2022
    Nestling in a valley beside the Andes mountain range, Santiago has a growing population and has suffered from increasingly heavy congestion in recent years, requiring a new urban road link for which safety has been set as a priority for drivers - *iRAP reports
  • New section planned for the Pennsylvania Turnpike
    March 27, 2020
    A new stretch of road is needed for the Pennsylvania Turnpike.
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of