Skip to main content

New Turkish tunnel project being studied

A study is being carried out for a proposed combined use tunnel project in Turkey. The proposal is for a tunnel featuring three levels that would be able to handle both 75,000 passengers/hour by rail and 120,000 vehicles/day. The study should be complete during 2019, with a tender process expected soon after. Should the project go ahead, the build-operate-transfer model will be utilised.
March 11, 2019 Read time: 1 min

A study is being carried out for a proposed combined use tunnel project in Turkey. The proposal is for a tunnel featuring three levels that would be able to handle both 75,000 passengers/hour by rail and 120,000 vehicles/day. The study should be complete during 2019, with a tender process expected soon after. Should the project go ahead, the build-operate-transfer model will be utilised.

Related Content

  • Pavers produce on Chinese road building project
    May 19, 2015
    Volvo tracked pavers are helping China meet its ambitious programme of building 10,000km of roads annually. China’s ambitious road building programme is seeing over 10,000km of new highway being completed every year. Productivity, reliability and good uptime of equipment are key to this programme being achieved. And to the north of Xi’an, four Volvo Construction Equipment (Volvo CE) ABG8820 tracked pavers recently worked 14 hours/day paving the final layer of asphalt on a new highway. This 96km route opened
  • Turkish birdge/highway concession package reopens?
    March 20, 2012
    Despite the recent failure of the Turkish Government’s tender for the project to build a third bridge over the Bosphorus, the deal may yet go ahead. Japanese firms Itochu, Obayashi, IHI and Mitsubishi have revealed that they are still interested in constructing a third bridge over the Bosphorus at Istanbul, as well as constructing the associated tolled highway.
  • Istanbul’s new tunnel connection opens
    December 22, 2016
    Istanbul’s new Eurasia Tunnel has been opened for traffic, connecting the Asian and European side of the Bosporus strait. The new link will help reduce congestion in Istanbul and should cut travel times to just 15 minutes for drivers using the link. The tunnel runs from Kazlıçeşme on the European side to Göztepe on the Asian side of the Bosporus strait. The new route is 14.5km long, with a 5.4km tunnel stretch lying up to 106m below the Bosporus Strait and features two decks for vehicles and it is expect
  • Approval for new Gotthard Tunnel
    March 4, 2016
    Approval has been given for the project to build a new parallel link for the Gotthard Tunnel in Switzerland. The second road tunnel has been given the go ahead after 57% of Swiss subjects who voted in a referendum backed the plans. Construction of the new tunnel will start in 2020 and will end in 2027. In addition, the project calls for the current Gotthard road tunnel to be closed for three years for renovation work so as to bring it up to the latest safety requirements. Both tunnels will be open from 2030