Skip to main content

New Turkish tunnel project being studied

A study is being carried out for a proposed combined use tunnel project in Turkey. The proposal is for a tunnel featuring three levels that would be able to handle both 75,000 passengers/hour by rail and 120,000 vehicles/day. The study should be complete during 2019, with a tender process expected soon after. Should the project go ahead, the build-operate-transfer model will be utilised.
March 11, 2019 Read time: 1 min

A study is being carried out for a proposed combined use tunnel project in Turkey. The proposal is for a tunnel featuring three levels that would be able to handle both 75,000 passengers/hour by rail and 120,000 vehicles/day. The study should be complete during 2019, with a tender process expected soon after. Should the project go ahead, the build-operate-transfer model will be utilised.

Related Content

  • Repaving Barcelona Airport runway surfaces
    November 8, 2017
    A Spanish contractor has utilised an asphalt plant from Ammann to deliver high-quality material for a key runway at Barcelona Airport. The firm Benito Arnó e Hijos, won the deal to provide asphalt for the reconstruction of the main runway at Barcelona-El Prat Airport. The firm opted to use an Ammann ABT 280 SpeedyBatch plant for the project as this model offered the combination of both mobility and productivity as required. With the short-term nature of the project, a fixed plant would have been unsuitable
  • Repaving Barcelona Airport runway surfaces
    November 8, 2017
    A Spanish contractor has utilised an asphalt plant from Ammann to deliver high-quality material for a key runway at Barcelona Airport. The firm Benito Arnó e Hijos, won the deal to provide asphalt for the reconstruction of the main runway at Barcelona-El Prat Airport. The firm opted to use an Ammann ABT 280 SpeedyBatch plant for the project as this model offered the combination of both mobility and productivity as required. With the short-term nature of the project, a fixed plant would have been unsuitable
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor
  • Vietnam road projects underway
    February 5, 2021
    Key Vietnam road projects are currently underway.