Skip to main content

New Turkish tunnel project being studied

A study is being carried out for a proposed combined use tunnel project in Turkey. The proposal is for a tunnel featuring three levels that would be able to handle both 75,000 passengers/hour by rail and 120,000 vehicles/day. The study should be complete during 2019, with a tender process expected soon after. Should the project go ahead, the build-operate-transfer model will be utilised.
March 11, 2019 Read time: 1 min

A study is being carried out for a proposed combined use tunnel project in Turkey. The proposal is for a tunnel featuring three levels that would be able to handle both 75,000 passengers/hour by rail and 120,000 vehicles/day. The study should be complete during 2019, with a tender process expected soon after. Should the project go ahead, the build-operate-transfer model will be utilised.

Related Content

  • Innovative road/drainage tunnel plan for Jakarta
    February 16, 2015
    An innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The
  • Major tunnel project for Peru?
    March 16, 2012
    The authorities in the Peruvian city of Lima are planning the construction of a tunnel to connect with Huancayo. A budget of US$1.86 million has been set to pay for a feasibility study into the project.
  • Building New zealand's landmark tunnel
    February 15, 2012
    A landmark tunnelling project is commencing in New Zealand - Kristina Smith reports. New Zealand is preparing to embark on its biggest transport project ever. In August it announced that it had selected its preferred bidder for the NZ$1.4 billion Waterview Connection in Auckland, 5km of new motorway connecting highways to the North and South of the city.
  • Tunnel waterproofing solutions
    February 29, 2012
    Tunnels are the highest value assets on a highway, making their operation, safety and maintenance of paramount importance. Patrick Smith reports