Skip to main content

New Turkish tunnel project being studied

A study is being carried out for a proposed combined use tunnel project in Turkey. The proposal is for a tunnel featuring three levels that would be able to handle both 75,000 passengers/hour by rail and 120,000 vehicles/day. The study should be complete during 2019, with a tender process expected soon after. Should the project go ahead, the build-operate-transfer model will be utilised.
March 11, 2019 Read time: 1 min

A study is being carried out for a proposed combined use tunnel project in Turkey. The proposal is for a tunnel featuring three levels that would be able to handle both 75,000 passengers/hour by rail and 120,000 vehicles/day. The study should be complete during 2019, with a tender process expected soon after. Should the project go ahead, the build-operate-transfer model will be utilised.

Related Content

  • Georgia tunnel project proposed
    August 19, 2019
    A new road tunnel connection has been proposed by Georgia. The tunnel would be from Kobi to Gudauri on the highway connecting Mtskheta with Stepantsminda and Lars. This E117 route passes through an area of difficult terrain between Kobi and Gudauri. The tunnel would avoid some of the most challenging, mountainous sections of the present E117 alignment. The E117 is known for having some of the most challenging highway stretches in Europe, with a series of switchbacks close to Ganisi (to the south of the plan
  • Smart compaction at new airport project
    February 7, 2017
    A new airport project is benefiting from some of the latest developments in compaction technology Work started on a new airport for Istanbul in June 2014, with the facility set to be one of the world's largest and to set new standards when it opens for business. BOMAG has been playing a key role in the construction work at the new site, which is located close to the Black Sea coast. The construction equipment company has worked closely with the engineering team on site and BOMAG machines are now carr
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • Tanzania’s work on East Africa’s multi-national road project
    November 28, 2022
    Tanzania is kick-starting construction work on the missing link in East Africa's multinational road