Skip to main content

New tunnel link proposed for Colombia

Even as work continues on La Linea tunnel in Colombia, the country’s government has received a proposal for an additional tunnel link. A consortium made up of Colombian companies and Italian firms has suggested building a new tunnel to link Quindio and Tolima. Odinsa, Mincivil, Impregilo and Salini are involved in the consortium and have suggested a PPP as being a possible model under which to construct the link, which could cost in the order of US$531 million and would be 8.5km long. The economic case for
July 23, 2013 Read time: 2 mins
Even as work continues on La Linea tunnel in Colombia, the country’s government has received a proposal for an additional tunnel link. A consortium made up of Colombian companies and Italian firms has suggested building a new tunnel to link Quindio and Tolima. 3214 Odinsa, Mincivil, 3149 Impregilo and Salini are involved in the consortium and have suggested a PPP as being a possible model under which to construct the link, which could cost in the order of US$531 million and would be 8.5km long. The economic case for this new route has yet to be made clear as the tunnel would lie comparatively close to the La Linea tunnel.

Progress with the current La Linea tunnel project in Colombia has been slow due to a series of delays. This link will connect Calarca and Cajamarca in the central Corderilla of the Colombian Andes and at around 8.6km, will be the longest road tunnel in Latin America when complete. When open to traffic La Linea tunnel will reduce travel times along Route 40 between Bogota and Cali and also the port of Buenaventura. This difficult project has met with numerous challenges, from technical, financial and legal standpoints. Altitude has not made the project any easier either and one tunnel portal is at 2,400m above sea level while the other is at 2,500m. However when it is complete the benefit to the Colombian economy will be significant as it will improve transport and cut accidents by replacing a treacherous existing route. From an engineering standpoint, the opening of La Linea tunnel will be a significant achievement for Colombia’s construction industry.

For more information on companies in this article

Related Content

  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Colombia plans PPP project
    February 5, 2015
    A new highway project is planned for Colombia, which will be designed and constructed under a PPP concession. The Colombian Government awarded the project to Grupo Odinsa. This will be the country’s second PPP highway project and is expected to cost in the region of US$513 million to construct. The complete 325km project includes building a ring road in Villavicencio, as well as works between Villavicencio-Acacias, Villavicencio-Apiay and between Puerto Gaitan-Puente Arimena. Colombia’s National Infrastruct
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Colombia’s La Linea Tunnel will be completed
    September 16, 2015
    Colombia's national road institute (Invias) has said that the La Linea tunnel project will open to traffic in 2017. The project has been delayed on several occasions and due to a variety of reasons, presenting a luckless and lengthy tale of woe for Colombia’s transport ministry. Early in its lifetime the project was held back by unexpected geological issues arising from more challenging ground conditions than had been initially realised. The project was also delayed by insurance problems for some of the fir