Skip to main content

New tunnel link proposed for Colombia

Even as work continues on La Linea tunnel in Colombia, the country’s government has received a proposal for an additional tunnel link. A consortium made up of Colombian companies and Italian firms has suggested building a new tunnel to link Quindio and Tolima. Odinsa, Mincivil, Impregilo and Salini are involved in the consortium and have suggested a PPP as being a possible model under which to construct the link, which could cost in the order of US$531 million and would be 8.5km long. The economic case for
July 23, 2013 Read time: 2 mins
Even as work continues on La Linea tunnel in Colombia, the country’s government has received a proposal for an additional tunnel link. A consortium made up of Colombian companies and Italian firms has suggested building a new tunnel to link Quindio and Tolima. 3214 Odinsa, Mincivil, 3149 Impregilo and Salini are involved in the consortium and have suggested a PPP as being a possible model under which to construct the link, which could cost in the order of US$531 million and would be 8.5km long. The economic case for this new route has yet to be made clear as the tunnel would lie comparatively close to the La Linea tunnel.

Progress with the current La Linea tunnel project in Colombia has been slow due to a series of delays. This link will connect Calarca and Cajamarca in the central Corderilla of the Colombian Andes and at around 8.6km, will be the longest road tunnel in Latin America when complete. When open to traffic La Linea tunnel will reduce travel times along Route 40 between Bogota and Cali and also the port of Buenaventura. This difficult project has met with numerous challenges, from technical, financial and legal standpoints. Altitude has not made the project any easier either and one tunnel portal is at 2,400m above sea level while the other is at 2,500m. However when it is complete the benefit to the Colombian economy will be significant as it will improve transport and cut accidents by replacing a treacherous existing route. From an engineering standpoint, the opening of La Linea tunnel will be a significant achievement for Colombia’s construction industry.

For more information on companies in this article

Related Content

  • Øresund Bridge invests in storm protection
    March 8, 2022
    Danish consortium Øresundsbro Konsortiet will install walls and ramparts near tunnel openings.
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Progress being made for key Chile mega projects
    February 22, 2016
    Progress is being made in Chile for two key mega projects, the Chacao Bridge and the El Melon Tunnel. Chile's Ministry of Public Works (MOP) has ordered the consortium working on the Chacao Bridge project to carry out additional studies. The consortium comprises Systra, OAS, Aas-Jakobsen and Hyundai and the project is worth US$511.45 million. The consortium has to respond to observations made by the MOP on the design proposal presented in August 2014. The works to build the bridge now look likely to continu