Skip to main content

New toll road link for Indonesia

Work is progressing on an important toll road project in Indonesia that will link Bogor, Sukabumi and Ciawi in West Java. The construction work is being carried out by Trans Jabar Tol, a subsidiary of state-owned firm Waskita Karya. The project is costing some US$577.6 million and will reduce travel time from Sukabumi to Indonesia’s capital Jakarta to one hour, compared with the four hours the journey can take at present. The project was intended to be complete by 2018 but could now take until 2019 to finis
June 24, 2016 Read time: 1 min
Work is progressing on an important toll road project in Indonesia that will link Bogor, Sukabumi and Ciawi in West Java. The construction work is being carried out by Trans Jabar Tol, a subsidiary of state-owned firm 7966 Waskita Karya. The project is costing some US$577.6 million and will reduce travel time from Sukabumi to Indonesia’s capital Jakarta to one hour, compared with the four hours the journey can take at present. The project was intended to be complete by 2018 but could now take until 2019 to finish.

For more information on companies in this article

Related Content

  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • First section of new Texas route opening
    November 21, 2017
    The first stretch of a highway development project in Texas is now open. New southbound toll lanes have been built for the Texas 288 project, running between downtown Houston and the Brazoria County line. The existing southbound traffic is being shifted to these lanes on a temporary basis between Holly Hall and Loop 610. But drivers are not being tolled at present. The US$815 million work is due for completion in 2019, when the tolling system will come into full use. The project involves widening the route
  • Nigeria’s new US$2 billion coastal highway
    April 25, 2024
    Nigeria is planning a US$2 billion coastal highway.
  • Costa Rica construction contracts
    May 22, 2020
    Costa Rica construction contracts are facing challenges.