Skip to main content

New Tisza River bypass bridge to be built at Szolnok, Hungary

Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million. Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years. Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Brid
June 28, 2019 Read time: 2 mins
Szolnok – about to get another road bridge – is home to Central Europe’s longest pedestrian bridge, the Tiszavirag Pedestrian Bridge or Mayfly Bridge © Attila Jandi | Dreamstime.com
Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million.


Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years.

Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Bridge - Szent István Híd – a two-lane structure that opened in 1992.

Nearby the St. Stephen’s Bridge lies the remains of a Turkish wooden bridge built during the Ottoman Empire era in the 16th century. However, the bridge - believed to be the first permanent bridge over the Tisza - can be seen only when the river reaches extremely low levels.

The town also boasts the longest foot-bridge in Central Europe – the Mayfly Bridge (Tiszavirag Pedestrian Bridge) at the confluence of the rivers Tisza and Zagyva. It connects the centre of Szolnok to the green belt across the river helping to develop a recreational area. The 444m-long bridge has a span of 120m between the two supporting pillars and 60° outward leaning arches.

Related Content

  • Israel interchange
    March 20, 2012
    A new US$350 million road project by the Israel National Roads Company will boost connectivity from the north to the centre of the country. The project is seeing the opening of new interchanges and roads in western Galilee.
  • Siemens system helps enforce weight limit on New Bridge, Oxfordshire
    May 18, 2018
    Siemens UK is supplying 21st century technology to help protect a 13th century stone arch bridge over the River Thames in England. The 665m-long New Bridge has national recognition and statutory protection from alteration, but is suffering from the weight of modern vehicles. Siemens’ system is the first time that automatic number plate recognition cameras are being used to enforce a road weight restriction in the county of Oxfordshire. “Evidence downloaded from the cameras can be used to demonstrate that d
  • Final touches for Seattle’s SR520 floating bridge
    November 21, 2017
    Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane
  • East Africa drives towards road tolling
    March 18, 2016
    Road tolling is increasing in East Africa as the region’s countries expand highway networks - Shem Oirere writes. The drive towards road tolling in East Africa is gaining momentum. Uganda appears to have broken ranks with its neighbours to make huge strides in achieving progress with this innovative road financing plan. Road tolling has hitherto has been held back in East Africa for lack of political goodwill and State bureaucracies. Kenyan government officials have made announcements on planned road tollin