Skip to main content

New Tisza River bypass bridge to be built at Szolnok, Hungary

Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million. Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years. Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Brid
June 28, 2019 Read time: 2 mins
Szolnok – about to get another road bridge – is home to Central Europe’s longest pedestrian bridge, the Tiszavirag Pedestrian Bridge or Mayfly Bridge © Attila Jandi | Dreamstime.com
Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million.


Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years.

Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Bridge - Szent István Híd – a two-lane structure that opened in 1992.

Nearby the St. Stephen’s Bridge lies the remains of a Turkish wooden bridge built during the Ottoman Empire era in the 16th century. However, the bridge - believed to be the first permanent bridge over the Tisza - can be seen only when the river reaches extremely low levels.

The town also boasts the longest foot-bridge in Central Europe – the Mayfly Bridge (Tiszavirag Pedestrian Bridge) at the confluence of the rivers Tisza and Zagyva. It connects the centre of Szolnok to the green belt across the river helping to develop a recreational area. The 444m-long bridge has a span of 120m between the two supporting pillars and 60° outward leaning arches.

Related Content

  • New South Wales backpedals over WestConnex cycling bridge
    April 30, 2019
    Controversy has again hit Australia’s WestConnex project in Sydney with media reports the a planned cycle and pedestrian bridge is to be axed. In its place will be a new raised flyover running through the residential and parkland area, according to a report in The Age newspaper. The Pedestrian and Cycling Green Link was part of the original planning permission for the US$11.85 billion WestConnex project and was to rise above parts of the surface motorway in Rozelle and Lilyfield neighbourhoods. The
  • Bavarian Autobahn bridge repairs
    March 11, 2019
    Austrian contractor STRABAG is heading a consortium that will carry out bridge upgrades on the busy A9 Autobahn connecting Nuremburg with Munich in Bavaria, southern Germany. The eight bridges between the Nuremburg/Feucht interchange and the Hipoltstein junction will be demolished and replaced with new structures. The deal is worth € 38 million and will be handled by the consortium comprising STRABAG, subdivision Bavaria North, and Ed Züblin, Subdivision Bridge Construction. The client for the project is Au
  • Hyundai is focusing on quality with a new development
    September 24, 2019
    Hyundai Construction Equipment is focussing on performance and quality with its new project to establish a Reliability Assessment Centre. This research and development facility will be constructed in Yongin, Gyeonggi-do (South-Korea) in a bid to strengthen Hyundai’s quality competitiveness. The firm has held a groundbreaking ceremony for the construction of the reliability assessment centre and a performance evaluation laboratory for finished equipment on a 40,000m² site at the Mabuk-ri Research Institute i
  • Vahostav-SK and TuCon to build Slovakia’s Presov northern bypass
    July 4, 2019
    Slovak contractors Vahostav-SK and TuCon will build the first stage of the 4.3km northern bypass in Presov on the R4 dual carriageway. The contract was awarded in an open tender by Slovakia’s motorway company NDS. The consortium offered the lowest price of just under €143 million against around €170 million as estimated by NDS which says work will start this summer. NDS also said that it had received five firm bids for the work which will likely take three years and nine months, for completion in 2