Skip to main content

New Tisza River bypass bridge to be built at Szolnok, Hungary

Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million. Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years. Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Brid
June 28, 2019 Read time: 2 mins
Szolnok – about to get another road bridge – is home to Central Europe’s longest pedestrian bridge, the Tiszavirag Pedestrian Bridge or Mayfly Bridge © Attila Jandi | Dreamstime.com
Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million.


Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years.

Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Bridge - Szent István Híd – a two-lane structure that opened in 1992.

Nearby the St. Stephen’s Bridge lies the remains of a Turkish wooden bridge built during the Ottoman Empire era in the 16th century. However, the bridge - believed to be the first permanent bridge over the Tisza - can be seen only when the river reaches extremely low levels.

The town also boasts the longest foot-bridge in Central Europe – the Mayfly Bridge (Tiszavirag Pedestrian Bridge) at the confluence of the rivers Tisza and Zagyva. It connects the centre of Szolnok to the green belt across the river helping to develop a recreational area. The 444m-long bridge has a span of 120m between the two supporting pillars and 60° outward leaning arches.

Related Content

  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • Costs rise for Berettyoujfalu-Nagykereki work
    June 8, 2021
    Hungary's deal with local companies A-Hid, Duna-Aszfalt and Hodut was signed in April 2017 for US$290 million.
  • Poland: S6 expressway and A2 motorway receive EU funding
    November 23, 2018
    Subsidies worth more than €228 have been granted by the European Union for the construction of the S6 expressway section to link Slupsk with Gdansk. Also, around €77 million from the EU has been granted for the A2 section between Warsaw and Minsk Mazowiecki. The S6 section will be almost 41km long and will cost over €470 million is expected to be completed in October 2021. The 15km A2 section is due to be ready in June 2020 at a total cost of €193 million.
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req