Skip to main content

New Tisza River bypass bridge to be built at Szolnok, Hungary

Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million. Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years. Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Brid
June 28, 2019 Read time: 2 mins
Szolnok – about to get another road bridge – is home to Central Europe’s longest pedestrian bridge, the Tiszavirag Pedestrian Bridge or Mayfly Bridge © Attila Jandi | Dreamstime.com
Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million.


Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years.

Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Bridge - Szent István Híd – a two-lane structure that opened in 1992.

Nearby the St. Stephen’s Bridge lies the remains of a Turkish wooden bridge built during the Ottoman Empire era in the 16th century. However, the bridge - believed to be the first permanent bridge over the Tisza - can be seen only when the river reaches extremely low levels.

The town also boasts the longest foot-bridge in Central Europe – the Mayfly Bridge (Tiszavirag Pedestrian Bridge) at the confluence of the rivers Tisza and Zagyva. It connects the centre of Szolnok to the green belt across the river helping to develop a recreational area. The 444m-long bridge has a span of 120m between the two supporting pillars and 60° outward leaning arches.

Related Content

  • Slovakia’s Cabinet to have final say on D4 Bratislava bypass
    February 9, 2016
    The government of Robert Fico has said it will decide the fate of the controversial €1 billion Bratislava bypass, the D4 motorway project, possibly ahead of a national parliamentary election next month. Fico, who also was prime minister from 2006-2010, was re-appointed after leading his Direction Social Democracy party (SMER-SD) to a landslide victory in the 2012 parliamentary election. His party won 83 seats and formed an absolute majority government, Slovakia’s first since 1989. Controversy continue
  • Congestion charge planned for Hungary capital
    December 17, 2012
    The European Commission (EC) is encouraging the Hungarian authorities to implement a congestion charge scheme in capital Budapest by 2015. The move is required so that the Hungarian authorities can repay the EC with loans used to fund the construction a new line for Budapest’s underground metro system. The Hungarian Government earlier failed to pass a proposal to introduce the congestion charge scheme in Budapest but the EC is pushing for this scheme to be implemented by 2015.
  • First deck span completed for Mersey Gateway's north approach viaduct
    April 4, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. Work started on site in May 2014 to build a six-lane toll bridge over the Mersey River between the towns of Runcorn and Widnes and opening is set for the autumn of 2017. As well as construction of the new bridge, works include the upgrading of 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of tra
  • Delay for tender for link roads to Istanbul’s new Bosporus bridge
    June 25, 2015
    The tender process for the road connections to the third bridge over the Bosporus in Turkey has been delayed once more. This is the third time the tender for the connecting roads for Istanbul's third bridge over the Bosporus has been postponed. The tender for the North Marmara Motorway was originally set for 6th March 2015 but was then pushed back to the 6th May. It was then announced that the tender would be run in two stages, with the Kinali-Odayeri motorway tender on 7th July and the Kurtkoy-Akyazi motor