Skip to main content

New South Wales route construction means property demolition

Construction of a US$7.17 billion (A$9 billion) highway in New South Wales, Australia will require the demolition of up to 100 homes to prepare the route. The properties that will have to be demolished have a combined value of some $318.62 million (A$400 million), with owners having to be paid the necessary compensation. The 23km route will extend the existing M1 Princes Motorway. Construction of the tolled route will help reduce congestion in southern Sydney.
November 9, 2017 Read time: 1 min

Construction of a US$7.17 billion (A$9 billion) highway in New South Wales, Australia will require the demolition of up to 100 homes to prepare the route. The properties that will have to be demolished have a combined value of some $318.62 million (A$400 million), with owners having to be paid the necessary compensation. The 23km route will extend the existing M1 Princes Motorway. Construction of the tolled route will help reduce congestion in southern Sydney.

Related Content

  • UGL wins Australia’s NorthConnex M&E services contract
    September 7, 2015
    Engineering services provider UGL has signed a four-year deal with the Lend Lease Bouygues joint venture that is building the NorthConnex motorway in Sydney, Australia. The US$329 million contract is for the design, procurement, construction and commissioning of the electrical, mechanical, communication, fire and control systems needed for the project’s 9km twinned tolled tunnel. UGL provides outsourced engineering, asset management and maintenance services to rail, transport, power, resources, water an
  • New highways for New South Wales
    May 28, 2012
    Work on the eastern section of the Hunter Expressway project in New South Wales in Australia will be carried out by Theiss. The firm won the deal for preliminary design and development of the US$736 million (A$825 million) project, which is for a 13.3km section of the link. Theiss is working on the project with Hyder Consulting and Parsons Brinkerhoff. Once the Hunter Expressway is complete in late 2013, it will cut travel times from the Hunter to Newcastle by 28 minutes.
  • Melbourne’s new $20.4 billion ring road
    July 17, 2025
    Work for Melbourne’s new $20.4 billion ring road will have to be ahead of schedule.
  • Bridge demolition with breakers
    May 5, 2021
    Hydraulic breakers from Italian firm Indeco have been used successfully to carry out important work on the Princes Freeway in Australia’s Victoria State.