Skip to main content

New South Wales backpedals over WestConnex cycling bridge

Controversy has again hit Australia’s WestConnex project in Sydney with media reports the a planned cycle and pedestrian bridge is to be axed. In its place will be a new raised flyover running through the residential and parkland area, according to a report in The Age newspaper. The Pedestrian and Cycling Green Link was part of the original planning permission for the US$11.85 billion WestConnex project and was to rise above parts of the surface motorway in Rozelle and Lilyfield neighbourhoods. The
April 30, 2019 Read time: 2 mins
Controversy has again hit Australia’s WestConnex project in Sydney with media reports that a planned cycle and pedestrian bridge is to be axed.


In its place will be a new raised flyover running through the residential and parkland area, according to a report in The Age newspaper.

The Pedestrian and Cycling Green Link was part of the original planning permission for the US$11.85 billion WestConnex project and was to rise above parts of the surface motorway in Rozelle and Lilyfield neighbourhoods.

The 33km WestConnex motorway, which runs mostly underground, is a joint project of the 5498 New South Wales state government and the Australian government. It includes widening and extending the M4 Western Motorway, a new section for the M5 Motorway and a new inner western bypass of Sydney’s central business district to connect the M4 and M5. Work includes 16km of new tunnels as well as widening 7.5km of the existing M4 and which will converted to a private tollway.

To help fund the project, the publicly-owned M5 East Motorway will be converted to a private tollway, while the toll on the existing M5 will be extended for a further 34 years.

For more information on companies in this article

Related Content

  • Replace bridge for Vancouver’s Massey Tunnel could aid congestion
    December 21, 2015
    Opponents of a proposed 10-lane bridge near Vancouver, Canada, said the structure will encourage urban sprawl in a region that is already struggling with a booming population. The British Columbia provincial government recently opened the final round of public consultation for the planned 3.3km toll bridge likely to cost around US$2.54 billion.
  • Key Australian road projects underway
    December 19, 2014
    In Western Australia plans are in hand for the new Perth freight link. This will run between Muchea and Fremantle, and it will start with the Roe 8 project and extend Roe Highway through to Stock Road. The route will remove some 500 trucks/day from the Leach Highway, helping cut congestion. The project will cost around US$1.3 billion (A$1.6 billion), with funding split between the Western Australia State Government and the Federal Government. The route should be complete in 2016. Also in Australia, work has
  • Highway link for Melbourne, Australia
    December 9, 2015
    Plans are now well in hand in Australia for the US$4.04 billion Western Distributor Project in Victoria, due for completion in 2022. The project will be built under a new partnership between the Victorian state government and Transurban. The road project is supported by the Victorian Transport Association and will connect the West Gate Freeway to CityLink. The new route will help reduce the numbers of HGVs using the West Gate Bridge and will also upgrade the link to the Port of Melbourne. The project calls
  • Bulgaria signs Shipka Pass deal
    June 17, 2022
    The PSVT consortium picked up the Shipka Pass Tunnel project as part of the bypass for Gabrovo City, a town of around 50,000 situated on the Yantra River.