Skip to main content

New South Africa bridge project for STRABAG

Contractor STRABAG is to work on the project to build a new bridge connection in South Africa. This structure is of note as it will be Africa’s highest bridge at 223m high. The 1,132m long bridge will span the Mtentu River in eastern South Africa, close to the town of Flagstaff. The contract has a value of around €106 million and the construction work is expected to take 40 months to complete. STRABAG International is working with the South African contractor AVENG Grinaker-LTA on the project
September 6, 2017 Read time: 2 mins
STRABAG and AVENG Grinaker-LTA have formed a joint venture to build a new bridge over the Mtentu River in South Africa, as this rendering reveals
Contractor 945 STRABAG is to work on the project to build a new bridge connection in South Africa. This structure is of note as it will be Africa’s highest bridge at 223m high. The 1,132m long bridge will span the Mtentu River in eastern South Africa, close to the town of Flagstaff. The contract has a value of around €106 million and the construction work is expected to take 40 months to complete. STRABAG International is working with the South African contractor AVENG Grinaker-LTA on the project, with the two carrying out the work under a 50:50 joint venture partnership. The work is being carried out for the client, South African National Roads Agency (SANRAL).

Two bridge building methods will be used for the project. The northern and southern portions of the bridge will be constructed using incremental launching. Meanwhile the centre section will be built using the balanced cantilever method. The completed bridge will be supported by 13 piers.

For more information on companies in this article

Related Content

  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Bridge milestones for Transylvania in Romania
    July 21, 2025
    The Transylvania Bridge - Romania’s longest cable-stayed bridge - and the Buzău River Bridge - the country’s longest bridge - were recently completed.
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.