Skip to main content

New South Africa bridge project for STRABAG

Contractor STRABAG is to work on the project to build a new bridge connection in South Africa. This structure is of note as it will be Africa’s highest bridge at 223m high. The 1,132m long bridge will span the Mtentu River in eastern South Africa, close to the town of Flagstaff. The contract has a value of around €106 million and the construction work is expected to take 40 months to complete. STRABAG International is working with the South African contractor AVENG Grinaker-LTA on the project
September 6, 2017 Read time: 2 mins
STRABAG and AVENG Grinaker-LTA have formed a joint venture to build a new bridge over the Mtentu River in South Africa, as this rendering reveals
Contractor 945 STRABAG is to work on the project to build a new bridge connection in South Africa. This structure is of note as it will be Africa’s highest bridge at 223m high. The 1,132m long bridge will span the Mtentu River in eastern South Africa, close to the town of Flagstaff. The contract has a value of around €106 million and the construction work is expected to take 40 months to complete. STRABAG International is working with the South African contractor AVENG Grinaker-LTA on the project, with the two carrying out the work under a 50:50 joint venture partnership. The work is being carried out for the client, South African National Roads Agency (SANRAL).

Two bridge building methods will be used for the project. The northern and southern portions of the bridge will be constructed using incremental launching. Meanwhile the centre section will be built using the balanced cantilever method. The completed bridge will be supported by 13 piers.

For more information on companies in this article

Related Content

  • New Vietnam bridge project to cut congestion
    October 24, 2016
    A new bridge project in Vietnam’s Ho Chi Minh City will help cut traffic congestion. The project is expected to cost in the region of US$157 million and four contractors will work on the construction of the 3.2km long Bình Tiên Bridge. The plans call for the bridge to carry four traffic lanes and be from 30-40m wide, although the design has yet to be finalised. The work will be carried out in two separate sections, while the client for the Bình Tiên Bridge and Road project is Ho Chi Minh’s Transport Departm
  • Russian roads and bridges being planned
    April 22, 2020
    Russian road and bridge construction and maintenance works are being planned.
  • Tender evaluation nears for Croatia’s Peljeski Bridge Project
    September 22, 2017
    Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
  • Mostostal Warszawa makes lowest bids in Poland’s S9 tenders
    November 24, 2017
    A Mostostal Warszawa consortium has reportedly made the lowest bids to build three sections of the S19 from Nisko to Sokolow Malopolski in south-eastern Poland. The consortium’s bid was just over €187 million in total. Other bids which were received from a Strabag consortium and a Budimex consortium.