Skip to main content

New South Africa bridge project for STRABAG

Contractor STRABAG is to work on the project to build a new bridge connection in South Africa. This structure is of note as it will be Africa’s highest bridge at 223m high. The 1,132m long bridge will span the Mtentu River in eastern South Africa, close to the town of Flagstaff. The contract has a value of around €106 million and the construction work is expected to take 40 months to complete. STRABAG International is working with the South African contractor AVENG Grinaker-LTA on the project
September 6, 2017 Read time: 2 mins
STRABAG and AVENG Grinaker-LTA have formed a joint venture to build a new bridge over the Mtentu River in South Africa, as this rendering reveals
Contractor 945 STRABAG is to work on the project to build a new bridge connection in South Africa. This structure is of note as it will be Africa’s highest bridge at 223m high. The 1,132m long bridge will span the Mtentu River in eastern South Africa, close to the town of Flagstaff. The contract has a value of around €106 million and the construction work is expected to take 40 months to complete. STRABAG International is working with the South African contractor AVENG Grinaker-LTA on the project, with the two carrying out the work under a 50:50 joint venture partnership. The work is being carried out for the client, South African National Roads Agency (SANRAL).

Two bridge building methods will be used for the project. The northern and southern portions of the bridge will be constructed using incremental launching. Meanwhile the centre section will be built using the balanced cantilever method. The completed bridge will be supported by 13 piers.

For more information on companies in this article

Related Content

  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • Czech bridge sees world formwork debut
    July 23, 2012
    The Czech government is investing heavily in upgrading and modernising the country's top-tier transportation infrastructure. This year alone, building works with a total investment of over E1.6 billion are planned or underway on the Czech motorway and main road network. Completion of the D8 motorway between the Czech capital Prague and Dresden in the east of Germany has a high priority, and as part of this large-scale project, the contracting consortium of SMP and Metrostav is erecting the 585m long Prosmyk
  • Doka’s Voest Bridge bypass project
    February 10, 2020
    The Voest Bridge over the Danube River is part of the A7 Mühlkreis Autobahn through Linz, Austria, is 40 years. Two bypass bridges are being constructed alongside the existing cable-stayed bridge as part of the client ASFINAG’s strategy to boost traffic capacity - around 100,000 vehicles cross the old bridge each day.
  • Ireland's highway and tunnel projects
    May 10, 2012
    Northern Ireland construction company, Lagan Construction, is celebrating its part in two major infrastructure projects in Ireland. The company said that the openings of the A1 dual carriageway bypass at Newry, Northern Ireland, and the Limerick Tunnel, Republic of Ireland, were major achievements, and had employed 350 people over the past four years. The €138 million Newry bypass, commissioned by the Roads Service in December 2007 and completed five months ahead of schedule, was delivered by Amey Lagan